Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
Mr. Jack Jennings <br />County Administrator <br />Vero Beach Court House <br />Vero Beach, Florida 32960 <br />Dear Mr. Jennings: <br />• �2g;iO3� �2, . <br />4�ti �•* vks, <br />tof 1916 -0 <br />bun ��CEIVC�� <br />c�, �,�ni�,riistratots << <br />-October 25, 1976 <br />i <br />p 1 <br />i <br />This letter is written on behalf of Vero Med, a Partnership, <br />who. are the owners of: The NW 1/4 of the NE 1/4 of Section <br />36, Township 32 South, Range 39 East, Indian River County,. <br />Florida. <br />The above property is located immediately East of the Indian <br />River Memorial Hospital property and immediately South of <br />Barber Avenue, Our group would be willing to donate the <br />right of way to Barber Avenue as previously ag-feed in the <br />meeting with the Department of Transportation and provide <br />for a drainage ditch if construes*.ion of Barber Avenue along <br />the entire North side of our property is completed within <br />18 months frog: the date of this letter. <br />Very truly yours, j <br />rustee for Vero Die <br />THE ADMINISTRATOR INFORMED THE BOARD THAT HE HAS BEEN TO FORT <br />LAUDERDALE TWO OR THREE TIMES DURING THE LAST YEAR AND A HALF TRYING TO <br />RESOLVE THIS PROBLEM. HE EXPLAINED THAT THE NEW HOSPITAL NEEDS ADDITIONAL <br />DRAINAGE, AND THE DOT AGREED'TO ENLARGE THEIR DRAINAGE DITCH PROVIDED THEY <br />COULD GET 20' ADDITIONAL RIGHT-OF-WAY, THE HOSPITAL.WAS AGREEABLE TO THIS. <br />THEN VERO MED CAME INTO THE PICTURE, AND THEY ALSO NEEDED ADDITIONAL DRAIN- <br />AGE AND AGREED TO GIVE 20' ADDITIONAL RIGHT-OF-WAY. THE POSSIBILITY NEXT <br />AROSE THAT THE HOSPITAL AND VERO PIED MIGHT BE OPEN PRIOR TO THE OPENING <br />OF BARBER AVENUE, AND THE ADMINISTRATOR ASKED THE DOT TO CONSIDER LETTING <br />A MINI -CONTRACT SO THESE PLACES COULD DRAIN WHETHER BARBER AVENUE WAS OPEN <br />OR NOT. THE DOT WAS AGREEABLE TO THIS. THE ADMINISTRATOR CONTINUED THAT <br />NOW VERO MED HAS COME UP WITH THE STIPULATION THAT THEY ARE WILLING TO <br />DONATE THE RIGHT-OF-WAY ONLY IF THEY CAN BE ASSURED THAT CONSTRUCTION OF <br />BARBER AVENUE WILL BE COMPLETED WITHIN 18 MONTHS. HE STATED THAT HE HAS <br />LOTS OF RESERVATIONS ABOUT GUARANTEEING THIS. ADMINISTRATOR JENNINGS <br />eel <br />DEC 15197 <br />o �, &27 .1,;465 <br />