Laserfiche WebLink
DEPARTMENT OF UTILITY SERVICES <br />FINAL ASSESSMENT/IN-HOUSE ENGINEERING <br />COST CALCULATIONS <br />Description Amount *($) <br />PROJECT: WATER MAIN ASSESSMENT US 1WLMT <br />(Water Main along US #1 from Walmart to <br />Main Street) <br />CONSTRUCTION: $ 533,205.00 <br />$ <br />Contractor: <br />Surveying: Survey (Masteller Moler & Reed) $ 16,650:00 <br />Permits: FDEP $ 1,250.00 <br />FL EAST COAST RAILWAY LLC $ 350.00 <br />Title Search: $ - <br />Postage & Expr. Charges: $ 19.15 <br />$ - <br />Other Administrative: Scripps Treasure Coast $ 367.84 <br />Printing / Blueprints: Indian River Blueprint $ 146:56 <br />Printing / Blueprints:. Digital Tech., Inc. $ 273.12 <br />Printing: ABC Printing $ 744.32 <br />Advertisements _ $ - <br />Subtotal Total before In -House Costs $ 553,005:99 <br />In -House Engineering & Inspection Charges: <br />Surveying Services : Field Survey $ - <br />Title Search $ - <br />Easement Description $ - <br />Land / ROW Acquisition $ - <br />Design Services @ 6.00% $ . 33,180.36.. <br />Ref: ASCE, Figure 2 - Curve B <br />Permitting Services @ 0.50% $ 2,765.03 <br />Bidding & Award Services @ 0.75% $ 4,147.54 <br />Services During Construction @ 1.50% $ 8,295.09 <br />Administration @ 1.50% $ 8,295.09 <br />TOTAL PROJECT COST : $ 609,689.10 <br />Preliminary Assessment Value $677,406.00 <br />Final Assessment Value $609,689.10 <br />Percent Reduction (%) 10.0% <br />Total amount of Footage 11,100 <br />Cost / LF $54.93 <br />473-000-169-01536, WATER MAIN ASSESSMENT US 1 - WALMART <br />5/22/2003 0:00 <br />A • • royal' : <br />Asst. Dir. <br />Cap. Proj. <br />Envir. Eng. <br />Assess. Pro <br />