My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/23/1977
CBCC
>
Meetings
>
1970's
>
1977
>
2/23/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:38 AM
Creation date
6/3/2015 10:49:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/23/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ZONING DIRECTOR WALKER EXPLAINED THAT MR. MANN WISHES TO HAVE A <br />6' FENCE AROUND HIS PROPERTY, WHICH IS NOT UNUSUAL IN COMMERCIAL AREAS TO <br />PROTECT PROPERTY, HE NOTED THAT MR. MANN WILL HAVE TO GO BEFORE THE VARI- <br />ANCE BOARD IN ORDER TO BE ALLOWED TO HAVE THIS FENCE HEIGHT. <br />COMMISSIONER SIEBERT POINTED OUT THAT IF THIS REQUEST IS APPROVED, <br />THE APPLICANT MUST HAVE THE RESOLUTION AND RELEASE OF EASEMENT FORMS PRE- <br />PARED Ai HIS EXPENSE. <br />ON MOTION BY COMMIS.`IONER SCHMUCKER, SECONDED BY COMMISSIONER <br />SIEBERT, THE BOARD UNANIMOUSLY APPROVED THE RELEASE OF EASEMENTS BETWEEN <br />LOTS 1/1-A AND 2, BETWEEN LOTS 2 AND 3, AND BETWEEN LOTS 3 AND 4, OSLO <br />PARK, BLOCK D, UNIT 2, AS REQUESTED BY MONTE MANN, <br />RIVERS ANDERSON, REALTOR, APPEARED IN REGARD TO THE 310,000 G.P.D. <br />SEWER ALLOCATION GRANTED TO MEL SEMBLER uo ASSOCIATES ON AUGUST 4, 1976, <br />FOR A PROPOSED SHOPPING CENTER TO BE LOCATED AT THE INTERSECTION OF 12TH <br />STREET AND U.S. HIGHWAY 1. HE INFORMED THE BOARD THAT THEY HOPE TO GET <br />THE SHL'PING CENTER UNDER CONSTRUCTION IN ABOUT 25 DAYS AND ARE NOT HERE <br />ABOUT A WATER ALLOCATION AS THEY ARE GOING TO GET THEIR, WATER FROM LOWELL <br />LOHMAN, PRESIDENT OF TREASURE COAST UTILITIES, INC. <br />ROBERT LLOYD, CITY ENGINEER, DISCUSSED THE ROUTING OF THE SEWER <br />LINE TO THE PLANT, THE PROPOSED LINE IS TO BE A 4" FORCE MAIN ABOUT <br />6,000' LONG AND WILL HAVE A CAPACITY OF 100 GALLONS A MINUTE, ENOUGH TO <br />SERVICE ABOUT 5100 PEOPLE, THOUGH THEY WILL ONLY BE USING A CAPACITY OF <br />APPROXIMATELY 18 GALLONS A MINUTE. MR. LLOYD INQUIRED ABOUT THE RATES THE <br />COUNTY WILL CHARGE AND NOTED THAT THERE WILL BE A METER ON ONE END OF THE <br />LINE, AND THE CITY WILL CHARGE THE COUNTY OPERATION AND MAINTENANCE PLUS <br />10%. MR. LLOYD STATED THE REAL PROBLEM IS THAT MR. SEMBLER IS GOING TO <br />HAVE TO COLLECT FOR THE SEWAGE OR; POSSIBLY INCLUDE THIS IN HIS RENTALS. <br />HE SUGGESTED THAT THE COUNTY GIVE MR. SEMBLER A FRANCHISE SO HE COULD <br />CHARGE THE INDIVIDUAL STORE OWNER ON THE BASIS OF A METER THAT WOULD BE <br />INSTALLED AND RECOUP HIS COST THAT WAY. <br />COMMISSIONER SCHMUCKER ASKED HOW THE SEWER LINE WILL BE MAIN- <br />TAINED. <br />D <br />FEB 2 31977 fltor 463 <br />
The URL can be used to link to this page
Your browser does not support the video tag.