My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/23/1977
CBCC
>
Meetings
>
1970's
>
1977
>
3/23/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:38 AM
Creation date
6/11/2015 8:35:31 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/23/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADMINISTRATOR JENNINGS DISCUSSED WITH THE BOARD THE DOT'S RECOM- <br />MENDED IMPROVEMENTS TO STATE ROAD 512 AT THE NEW NORTH COUNTY MIDDLE/.JUNIOR <br />HIGH SCHOOL. THESE HAD BEEN PREVIOUSLY DISCUSSED WITH SUPERINTENDENT <br />MCCLURE AT THE MEETING OF AUGUST 18, 1976, AT WHICH TIME NO COST FIGURES <br />WERE AVAILABLE. THE ADMINISTRATOR INFORMED THE BOARD THAT THE DOT HAD THE <br />PLANS DRAWN UP TO PRIMARY ROAD SPECIFICATIONS AND CAME UP WITH A COST OF <br />$$0,000 TO $90,000. THE DOT DOES NOT HAVE THE FUNDS AVAILABLE FOR THIS. <br />THE ADMINISTRATOR NOTED THAT WHAT IS MAINLY NEEDED FOR THE SCHOOL WHEN IT <br />IS OPENED ARE THE HOLDING LANES. HE STATED THE DOT HAS AGREED TO HAVE <br />THEIR MAINTENANCE DEPARTMENT WORK WITH THE COUNTY. THEY WOULD CLEAR THE <br />ADDITIONAL RIGHT-OF-WAY, MOVE THE DITCHES OVER, HAUL IN THE FILL, DO THE <br />GRADING AND SET EVERYTHING UP FOR THE COUNTY TO PUT ON THE WEARING SURFACE. <br />ADMINISTRATOR JENNINGS CONTINUED THAT THE SOIL CEMENT BASE WOULD RUN ABOUT <br />$7,425, AND THE ASPHALT (APPROXIMATELY 375-380 TONS) WOULD BE ABOUT <br />$9,000, OR A TOTAL OF BETWEEN $16,000 -$16,500. THE DOT MAINTENANCE DE- <br />PARTMENT CAN ALSO DO THE STRIPING AND MARKING, <br />ADMINISTRATOR .JENNINGS ASKED THE BOARD IF THEY WISH TO PROCEED <br />IN THIS MANNER; ALSO WHERE THE MONEY WILL COME FROM; AND IF THE SCHOOL <br />BOARD WILL ENTER INTO IT. HE NOTED THAT IF THE ROAD AND BRIDGE DEPARTMENT <br />HAS $16,500 TO SPEND ON THIS PROJECT, WE CAN HAVE THESE HOLDING LANES <br />BUILT ACCORDING TO THE PLANS PREPARED BY THE DOT. <br />COMMISSIONER SIEBERT ASKED IF THE DOT DOES THE WORK, WOULD IT <br />COME OUT OF OUR SECONDARY ROAD FUNDS? <br />ADMINISTRATOR JENNINGS STATED THAT WE WOULD NOT HAVE TO SPEND A <br />PENNY BECAUSE THIS IS ON THE PRIMARY ROAD SYSTEM. THE PROBLEM IS THE <br />TIMING BECAUSE THE SCHOOL NEEDS TO OPEN IN SEPTEMBER. HE NOTED THAT HE <br />DOES NOT KNOW OF ANY LESS EXPENSIVE OR QUICKER WAY TO GET THIS WORK DONE <br />THAN AS SUGGESTED ABOVE AND STATED HE IS COUNTING ON THE SCHOOL BOARD COM- <br />ING OUT AND TYING TO THE PAVEMENT. <br />COMMISSIONER SCHMUCKER ASKED IF THE $16,500 COULD BE SQUEEZED <br />OUT OF THE CURRENT ROAD AND BRIDGE BUDGET, AND FINANCE OFFICER .JACKSON <br />STATED IT COULD. <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANINLOUSLY AUTHORIZED THE ADMINISTRATOR TO DO THE SOIL <br />am <br />2 <br />MAR 2 31977 ' 04 <br />
The URL can be used to link to this page
Your browser does not support the video tag.