Laserfiche WebLink
COST ESTIMATE Indian River County Department of Utilities <br /> Project: BOBBI J SUBDIVISION WATER ASSESSMENT PROJECT <br /> cription: UCP# 2161, WIP#473-000.169-547.00 <br /> Date: May 14,2002 <br /> Bid Bid Item <br /> Item No. Description Estimated Unit or <br /> uantity Unit Labor <br /> Measure Price <br /> I Mobilization Price <br /> 2 Maintenance of Traffic I LS <br /> 1 LS $3,000.00 <br /> 4 Insta116"PVC Water Main $1.500.00 <br /> 5 Install 6"Dir.Drill Under Conc.Drive 400 LF $16.00 <br /> 6 Install DI Restrained Fittings 90 LF $14.400.00 <br /> 0.5 $60.00 $5,400.00 <br /> 7 Install I"PE Water Service(5 S 1.Short) 5 TON $5,500.00 $2,750.00 <br /> Install 1"PE Water Service(3 S 1.Lon ) 3 $400.00 $2.000.00 <br /> 8 Install FHA w/6"GV&Tee EA. $700.00 $2.100.00 <br /> 10 Remove and Dispose of Asphalt I EA. $2.300.00 <br /> 1 TON $2.300.00 <br /> 11 Install S-3 Asphalt $100.00 $100.00 <br /> 10 SY $200.0 0 <br /> 12 R lace Rock Base 10 SY $20.00 <br /> 13 Replace Stabilized Subgrade $10.00 $100.00 <br /> 14 Select fell 10 SY $6.00 <br /> 20 CY $60.00 <br /> 16 Sod and topsoil $17.00 <br /> LF $340.00 <br /> 900 $2.15 <br /> 17 Subtotal Water System $1,935.00 <br /> 18 IRCDUS Contin enc Account I $36,185.00 <br /> Allowance 10% $3.618.50 <br /> Total Est. Constr. Cost $39,803.50 <br /> Surveying 1170 0.00 <br /> Record Drawin s 500.00 <br /> Design 1,000.00 <br /> Bidding&Award 500,00 <br /> Permittiniz 100,00 <br /> Construction Services 500,00 <br /> Administration 50,00 <br /> TOTAL PROJECT COST 45',003.50 <br /> ATTACHMENT 3 <br />