Laserfiche WebLink
Indian River County Department of Utilities <br />COST ESTIMATE <br />Project: MEADOWLARK WOODS SUBDIVISION WATER ASSESSMENT PROJECT <br />;cription: UCP # 2324, WIP # 473-169000-03521 <br />Date: April 27, 2007 <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total <br />Price <br />I <br />Mobilization <br />1 <br />LS <br />$3,000.00 <br />2 <br />12"X6" Tapping Sleeve & Valve <br />1 <br />EA. <br />$2,100.00 <br />$2,100.00 <br />3 <br />F&I 6" PVC Water Main <br />950 <br />LF <br />$14.00 <br />$13,300.00 <br />4 <br />F&I 6" GV&B <br />1 <br />EA <br />$900.00 <br />$900.00 <br />5 <br />6" Driv.eway Bores <br />120 <br />LF <br />$30.00 <br />$3,600.00 <br />6 <br />F&I 4" PVC Water Main <br />250 <br />LF <br />$8.00 <br />52,000.00 <br />7 <br />4" Driveway Bores <br />50 <br />LF <br />$25.00 <br />$1,250.00 <br />8 <br />F&I 4" GV&B <br />1 <br />EA <br />$700.00 <br />$700.00 <br />9 <br />F&I 2" PVC Water Main <br />160 <br />LF <br />$7.00 <br />$1,120.00 <br />10 <br />2" Driveway Bores <br />20 <br />LF <br />$20.00 <br />$400.00 <br />11 <br />F&I 1-1/2" PE Water Service (Dbl Short) <br />1 <br />EA <br />5600.00 <br />$600.00 <br />• 12 <br />F&I 1-1/2" PE Water Service (Dbl Long) <br />4 <br />EA <br />$800.00 <br />$3,200.00 <br />13 <br />install 1" PE Water Service ( Sgl. Short) <br />6 <br />EA <br />$400.00 <br />$2,400.00 <br />14 <br />Install 1" PE Water Service ( Sgl. Long) <br />2 <br />EA <br />$700.00 <br />$1,400.00 <br />15 <br />Install FHA w/ 6" GV&B <br />1 <br />EA <br />$3,000.00 <br />$3,000.00 <br />1.6 <br />Subtotal Water System <br />$38,970.00 <br />17 <br />Indian River Force Account 10% <br />- <br />$3,897 <br />Total Est. Constr. Cost $42,867.00 <br />Surveying 3,700.00 <br />Record Drawings 1,000.00 <br />Design 1,500.00 <br />Bidding & Award 500.00 <br />Permitting 250.00 <br />Construction Services 1,500.00 <br />Administration 1,000.00 <br />TOTAL PROJECT COST 52,317.00 <br />