My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/23/1977
CBCC
>
Meetings
>
1970's
>
1977
>
5/23/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:39 AM
Creation date
6/11/2015 8:44:02 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
05/23/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
South of North Winter Beach Road, North of the South County line. West of the <br />Atlantic Ocean and East of I-95 including rte City.of Vero Beach, will be provid6d <br />by a water supply plant and wastewater treatment and disposal facility owned ani <br />operated by the City of Vero Beach. The City would sell water and sewage <br />services to the County at agreed-upon charges and rates as stipulated herein. <br />The County would in turn retail these services to County residents. In the early <br />years. County will endeavour to concentrate effort toward service In the <br />Region IL Phase I area <br />3. OVERALL SYSTEM RESPONSIBILITIES <br />The County will assume the responsibility for gravity sewerage collection syste;6. <br />pump stations. transmission lines. and accessories for service areas within <br />the County as necessary to transport County sewage to the City treatment plant. <br />The County will also assume the responsibility for the water distribution systeni <br />within. the County and receive treated water from the City treatment plant. <br />The City shall provide a sewage wastewater treatment and disposal facility and a <br />water supply and treatment plant adequate to meet both City and County needs. <br />but shall not be obligated to make capital improvements for capacity increases. <br />except as hereinafter stated under "Term of Agreement". <br />The County and City will cooperate in projecting service area populations and <br />developing water and sewerage please construction programs. <br />4. SERVICE AREA DELINEATION <br />In addition to the area within the City Limits of Vero Beach. the City shall provide <br />complete water and sewer service to the beach area of the County, bounded by the <br />Northern boundary of Indian River Shores as presently constituted, and by the <br />County line on the south. It is the intent of the County to provide all water and <br />sewer services to the mainland portion of the County. except within areas where <br />the City now (January 1973) provides water and sewer service. <br />The right of the City to enter into Interim agreements for water and/or sewer <br />service, or both, within areas outside that defined hereinabove for the City. <br />shall be subject to approval from the County and tri -partite agreements between <br />the customer, the City and the County shall be entered into. in each such Instance. <br />-3- <br />b. SALE OF CITY'S WATER DISTRIBUTION FACILITIES <br />In the Mainland portion of the County, where the City owns water distribution <br />facilities and supplies water services only, the City may sell those facilities <br />to the County, subject to the Bond Ordinance, and within one year after written <br />request from the County, at a price which shall be negotiated, but not more than <br />the present-day replacement cost, as determined by the City's Consulting <br />Engineers, less 3 1/3% depreciation per year from the date of installation. Since <br />such a disposition of assets is governed by the Bond Ordinance. a certification <br />from its Consulting Engineers that the City's ability to meet its obligations will <br />not be impaired by such sale is a prerequisite to negotiations for the sale. <br />6. WATER AND SEWER INTERFACES <br />A. Sewerage <br />It is anticipated that the County will 'construct at its expense all waste transmission <br />lines and a master meter for delivering County sewage to the influent structure <br />at the treatment plant site. The City will receive the waste at the treatment <br />plant. Periodic meter calibration checks by the City and the County shall be <br />authorized. The City will provide all necessary assistance to the County in <br />obtaining all easements. rights-of-way, etc. as required for the County to <br />install transmission lines and accessories. within the City limits at no expense <br />to the City. Ownersliip and maintenance responsibilities of the County -installed. <br />facilities within' the City shall be decided within the legal framework of the <br />respective governments. <br />B. WATER SUPPLY <br />The City will deliver treated water at a specified pressure to the County on a <br />metered basis at the water treatment plant. The County shall at its expense <br />Install a master meter and transmission lines from the plant to the City limits. <br />Periodic meter calibration checks by the Qty and the County shall be authorized. <br />The City will provide all necessary assistance to the County in obtaining all <br />easements, rights-of-way, etc. as required for the County to install transmission <br />lines and accessories within the City limits at no expense to the City. Ownership <br />and maintenance responsibilities of the County -installed facilities within the City <br />shall be decided within the legal framework of the respective governments. <br />s <br />LNs <br />•j' <br />le <br />
The URL can be used to link to this page
Your browser does not support the video tag.