Laserfiche WebLink
2. AMENDING ARTICLE 7, PACE 5 OF -HE AGREEMENT "PHASING OUT OF <br />EXISTING PLANTS OWNED OR OPERATED BY OTHERS <br />Delete the second paragraph of Article 7, page S. <br />the costs and their decision shall be binding on both <br />parties. <br />4. CONSTRUCTION_SCHF.DULF.S <br />will be kept inforr.:rd II[ -„ L;, ,t <br />coordinated with plant progress. <br />5. PLANT CAPACITIES RESERVED FOR THE COUNTY <br />Water Treatment Plant - Capacity allocated tothe County shall bet <br />a. After completion of the plant expansion to 7.2 MCD <br />capacity, the County shall be allocated up to 864,000 gpd at a maxi- <br />mum flow rate of 600 gpm at 5 psi or more pressure. <br />b. After completion of the plant capacity to 9.0 MCD <br />capacity, 1,3009000 gpd at a maximum flow rate of 900 gpm at 5 psi <br />or more pressure. <br />Sewage Treatment Plant - Capacity allocated to the County shall <br />be a monthly daily average of 1.39 million gallons per day as <br />estimated by the County's consulting engineers to be the County's <br />1980 requirement. In no event shall any one day's flow exceed <br />1.58 MGD nor shall the peak flow exceed 20500 GPM in any fifteen <br />minute period. The City reserves the right to order the County <br />to correct causes of excessive flows including a moratorium on <br />further connections to its system if the allocated capacity is <br />equaled or exceeded. To protect the treatment plant, the City <br />shall have the right to restrict inflow from the County system <br />Into the treatment plant to the above stated flows. <br />6. STANDARDS OF ACCEPTABILITY <br />The County recognizes that the treatment plant's effluent quality <br />must comply with the rules and regulations of the Florida Depart- <br />ment of Pollution Control, the United States Environmental <br />Protection Agency and other regulatory agencies. The County <br />-4- <br />=!w <br />Lot 7, Block 14, Ocean Corporation (Gisela Ratter) <br />Lots 4 and S, Block 14, Ocean Corporation (Fred Eisler) <br />on or before twenty-four (24) months after its 4.5 MGD sewage <br />41 <br />treatment plant is accepted for service. <br />The County agrees to phase out all sewage treatment plants <br />1 <br />located in the Phase I area of Region II as listed in Section 5 <br />of the Master Plan within twenty-four (24) months after County <br />facilities are available to convey sewage to the City's plant. <br />5. AMENDING ARTICLE 9 PACE 6 OF THE AGREEMENT <br />RATES AND CHARGES' <br />Under "A. Bulk Water Sales on Page 7 after "C". Capital <br />_ <br />Invested under the Capital Improvement Program of 1972"9 <br />add the followings <br />d. Any Capital invested by the City to maintain, increase <br />or improve water supply at the treatment plant or well <br />fields, during the life of this Contract. <br />After "C. Advance Payments" on Page 8, add the followings <br />D. CITY ACCOUNT NUMBERS <br />City account numbers used in this article were taken from <br />the 1972 audit report. The proper account numbers shall <br />prevail in order to reflect full and proper costs in the <br />event of bookkeeping changes of account numbers. The County <br />shall be entitled to review the City's accounts'used herein <br />on an annual basis. In the event of disagreement as to <br />costs the City shall appoint one arbitrator and the County <br />one arbitrator and the two arbitrators selected shalt appoint <br />a third arbitrator and the three arbitrators shall determine <br />.3. <br />the costs and their decision shall be binding on both <br />parties. <br />4. CONSTRUCTION_SCHF.DULF.S <br />will be kept inforr.:rd II[ -„ L;, ,t <br />coordinated with plant progress. <br />5. PLANT CAPACITIES RESERVED FOR THE COUNTY <br />Water Treatment Plant - Capacity allocated tothe County shall bet <br />a. After completion of the plant expansion to 7.2 MCD <br />capacity, the County shall be allocated up to 864,000 gpd at a maxi- <br />mum flow rate of 600 gpm at 5 psi or more pressure. <br />b. After completion of the plant capacity to 9.0 MCD <br />capacity, 1,3009000 gpd at a maximum flow rate of 900 gpm at 5 psi <br />or more pressure. <br />Sewage Treatment Plant - Capacity allocated to the County shall <br />be a monthly daily average of 1.39 million gallons per day as <br />estimated by the County's consulting engineers to be the County's <br />1980 requirement. In no event shall any one day's flow exceed <br />1.58 MGD nor shall the peak flow exceed 20500 GPM in any fifteen <br />minute period. The City reserves the right to order the County <br />to correct causes of excessive flows including a moratorium on <br />further connections to its system if the allocated capacity is <br />equaled or exceeded. To protect the treatment plant, the City <br />shall have the right to restrict inflow from the County system <br />Into the treatment plant to the above stated flows. <br />6. STANDARDS OF ACCEPTABILITY <br />The County recognizes that the treatment plant's effluent quality <br />must comply with the rules and regulations of the Florida Depart- <br />ment of Pollution Control, the United States Environmental <br />Protection Agency and other regulatory agencies. The County <br />-4- <br />=!w <br />