My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-032
CBCC
>
Resolutions
>
2000's
>
2007
>
2007-032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/3/2017 11:38:50 AM
Creation date
9/30/2015 4:46:15 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2007-032
Approved Date
04/03/2007
Agenda Item Number
11.J.1
Resolution Type
Water Main Expansion
Entity Name
BCC
Subject
Setting time and place
Water Main Extension
Area
27th Drive North of 4th St.
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
2067
Document Relationships
2007-041
(Message)
Path:
\Resolutions\2000's\2007
2007-042
(Message)
Path:
\Resolutions\2000's\2007
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT 4 <br />14 !Subtotal Water Facilities I I <br />w <br />N <br />-. <br />p <br />o co <br />Ot <br />to A <br />w <br />2 !Furnish & Install 6" PVC Water Main i 440 I LF 1 $20.001 8,800.00 <br />1 (Mobilization (See Section 01025) I 1 1 LS 1 1 3,000.00 <br />F. <br />E <br />0 <br />a <br />Total Water Facilities Construction Cost (Bid Estimate) _ f I 1 I 533,990.001 <br />Indian River County Force Account, 10% of Item 32 I 10% _ I % $3,090.00 <br />Furnish & Install 1-1/2" PE Double Short Water Service <br />Furnish & Install I" PE Single Long Water Service (w/sleeve) _ <br />Furnish & Install 1" PE Single Short Water Service <br />Install Sample Points <br />Furnish & Install 2" Blow -Off <br />Lawn/ROW Restoration (Topsoil & Bahia Sod) <br />Furnish & Install Fire Hydrant Assembly w/ 6" GV&B <br />Furnish & Install 6" HDPE Dir. Drill Water Main <br />Fumish & Install 6" GV&B <br />Furnish & Install 2" PVC Water Main <br />1 TOTAL PROJECT COST ESTIMATE I $42,240.00 <br />TOTAL ESTIMATED CONSTRUCTION COST 533.990.00 <br />-J <br />w <br />A <br />w <br />0 ... <br />O <br />N tb <br />O <br />N <br />O <br />A 5.1 <br />c <br />O <br />6 <br />a <br />a <br />a <br />a <br />a <br />a <br />a <br />3 e <br />" o <br />g o <br />Administration <br />Construction Services <br />ro <br />— <br />Bidding & Award'. <br />Design <br />Record Drawings <br />O <br />O <br />0 <br />0 <br />fv <br />O <br />O <br />0 <br />0 <br />fog <br />O <br />O <br />0 <br />0 <br />w <br />O <br />0 <br />0 <br />w �J <br />0 0 <br />0 0 <br />0 <br />ooEA <br />w <br />0 <br />O <br />0 <br />0 <br />0 <br />69 <br />Ot fn <br />0 0 <br />0 0 <br />0 0 <br />fn <br />0 <br />0 <br />0 <br />n ^. <br />Vi <br />O <br />O <br />C <br />O <br />di <br />O <br />O <br />O <br />O <br />tIi <br />O <br />C <br />O <br />O <br />O <br />C <br />O <br />d9 <br />O <br />O <br />C <br />O <br />fh <br />4 <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />O <br />Nw <br />O <br />O <br />2,000.001 <br />O <br />O <br />750.00 <br />2,100.00 <br />O <br />O <br />4,000.001 <br />1,300.00 <br />N <br />O <br />O <br />'s O <br />ATTACHMENT 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.