Laserfiche WebLink
RESOLUTION NO. 2007-054 <br />!! <br />_a <br />r1 'Mobilization (See Section 01025) 1 1 LS 1 1 3,000.00 <br />8888 <br />)\ƒ\ <br />3,000.001 <br />488&8$ <br />,j/jj\ <br />32,000.001 <br />Indian River County Force Account, 10% of Item 32 1 9.20% I % 1 1 $3,090.001 <br />Total Water Facilities Construction Cost (Bid Estimate) I I I $35,090.001 <br />ATED CONSTRUCTION COST SO5,090.001 <br />8 <br />/ <br />e <br />» <br />\ <br />© <br />8 <br />t <br />1 TOTAL PROJECT COST ESTIMATE( S44,340.00I <br />Unit <br />Price <br />48$888)# <br />§■3§/\.) <br />I00'OOs$ <br />%q <br />§§ <br />L14 ISubtotalWaterFacilities 1 <br />Record Drawings <br />0 <br />Bidding & Award <br />• <br />• <br />Construction Services <br />Admin. & Advertising <br />2 <br />!) <br />%&t<!I§!§110 <br />TOTAL ESTIM <br />no <br />E° <br />!°' <br />i§a,——/,on <br />„ <br />! <br />E. <br />1 <br />Fumish & Install 6" PVC Water Main <br />Fumish & Install 2" PVC Water Main <br />Furnish & Install 6" HDPE Dir. Drill Water Main <br />'Furnish & Install 6" GV&B <br />Furnish & Install Fire Hydrant Assembly w/ 6" GV&B <br />(Furnish & Install 2" Blow -Off <br />''Lawn/ROW -Restoration (Topsoil & Bahia Sod) <br />\ <br />(Furnish & Install 1" PE Single Short Water Service <br />(Furnish & Install 1" PE Single Long Water Service (w/sleeve) <br />Fumish & Install 1-1/2" PE Double Short Water Service <br />2 <br />,,,WI,COCT, <br />