My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-044
CBCC
>
Resolutions
>
2000's
>
2005
>
2005-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 2:32:34 PM
Creation date
9/30/2015 4:24:19 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2005-044
Approved Date
04/05/2005
Agenda Item Number
11.J.1.
Resolution Type
Setting Time and Place
Entity Name
Orange Heights and Gallentine Subdivision
Subject
Water Main Extension
Area
North of CR 512 and West of Louisiana Avenue Sebastian
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
1210
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br />COST ESTIMATE <br />Project: Orange Heights and Gallentine Subdivisions Water Extension Project Phases 1 & II <br />icription: UCP # 2561, WIP # 472-169000-05507 <br />Date: March 22, 2005 <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total <br />Price <br />1 <br />Mobilization, Demobilization and MOT <br />1 <br />LS <br />$9,201.40 <br />$9,201.40 <br />2 <br />8"X6" Tapping Sleeve & Valve <br />1 <br />EA <br />$1,523.03 <br />$1,523.03 <br />Tap 8" Water Main <br />1 <br />EA <br />$500.00 <br />$500.00 <br />3 <br />6" PVC Water Main <br />3460.0 <br />LF <br />$10.97 <br />$37,956.20 <br />4" Water Main <br />1500.0 <br />LF <br />$7.17 <br />$10,755.00 <br />6" Directional Drill Water Main <br />200.0 <br />LF <br />$55.49 <br />$11,098.00 <br />4 <br />6" GV&B <br />5.0 <br />EA <br />$641.22 <br />$3,206.10 <br />6 <br />Install Permanent 2" Blowoff <br />4.0 <br />EA <br />$475.00 <br />$1,900.00 <br />Fire Hydrant w/GV&B <br />5.0 <br />EA <br />$2,307.00 <br />$11,535.00 <br />DIP Fittings <br />2 <br />TONS <br />$7,000.00 <br />$14,000.00 <br />Potholes <br />10 <br />EA <br />$100.00 <br />$1,000.00 <br />Bacterial Sample <br />5 <br />EA <br />$40.00 <br />$200.00 <br />12 <br />Sod and topsoil <br />2000 <br />Sy <br />$7.17 <br />$14,340.00 <br />Total Est. Constr. Cost $117,214.73 <br />Surveying 6,960.00 <br />Record Drawings 1,000.00 <br />Design 8,205.03 <br />Bidding & Award 1,172.15 <br />Permitting 500.00 <br />Construction Services 2,344.29 <br />Administration 2,344.29 <br />TOTAL PROJECT COST $140,000.00 <br />ATTACHMENT 3 <br />B - Cost Estimate For. DAN for Assessment Roll March 222005 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.