My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-044
CBCC
>
Resolutions
>
2000's
>
2005
>
2005-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 2:32:34 PM
Creation date
9/30/2015 4:24:19 PM
Metadata
Fields
Template:
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br />COST ESTIMATE <br />Project: Orange Heights and Gallentine Subdivisions Water Extension Project Phases 1 & II <br />icription: UCP # 2561, WIP # 472-169000-05507 <br />Date: March 22, 2005 <br />Bid <br />Item No. <br />Bid Item <br />Description <br />Estimated <br />Quantity <br />Unit of <br />Measure <br />Unit <br />Price <br />Total <br />Price <br />1 <br />Mobilization, Demobilization and MOT <br />1 <br />LS <br />$9,201.40 <br />$9,201.40 <br />2 <br />8"X6" Tapping Sleeve & Valve <br />1 <br />EA <br />$1,523.03 <br />$1,523.03 <br />Tap 8" Water Main <br />1 <br />EA <br />$500.00 <br />$500.00 <br />3 <br />6" PVC Water Main <br />3460.0 <br />LF <br />$10.97 <br />$37,956.20 <br />4" Water Main <br />1500.0 <br />LF <br />$7.17 <br />$10,755.00 <br />6" Directional Drill Water Main <br />200.0 <br />LF <br />$55.49 <br />$11,098.00 <br />4 <br />6" GV&B <br />5.0 <br />EA <br />$641.22 <br />$3,206.10 <br />6 <br />Install Permanent 2" Blowoff <br />4.0 <br />EA <br />$475.00 <br />$1,900.00 <br />Fire Hydrant w/GV&B <br />5.0 <br />EA <br />$2,307.00 <br />$11,535.00 <br />DIP Fittings <br />2 <br />TONS <br />$7,000.00 <br />$14,000.00 <br />Potholes <br />10 <br />EA <br />$100.00 <br />$1,000.00 <br />Bacterial Sample <br />5 <br />EA <br />$40.00 <br />$200.00 <br />12 <br />Sod and topsoil <br />2000 <br />Sy <br />$7.17 <br />$14,340.00 <br />Total Est. Constr. Cost $117,214.73 <br />Surveying 6,960.00 <br />Record Drawings 1,000.00 <br />Design 8,205.03 <br />Bidding & Award 1,172.15 <br />Permitting 500.00 <br />Construction Services 2,344.29 <br />Administration 2,344.29 <br />TOTAL PROJECT COST $140,000.00 <br />ATTACHMENT 3 <br />B - Cost Estimate For. DAN for Assessment Roll March 222005 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.