Laserfiche WebLink
IS COMMENCED...", AND HE WOULD LIKE THIS CHANGED TO COINCIDE WITH THE <br />BUILDING CODE WHICH CALLS FOR SIX MONTHS SUSPENSION INSTEAD OF ONE YEAR. <br />MR. ADAMS ALSO NOTED THAT IN THIS SAME PARAGRAPH, INASMUCH AS THEY DON'T <br />HAVE A DEFINITION OF THE WORD "SUSPENDED," HE WOULD LIKE -TO HAVE THE <br />FOLLOWING PHRASE INCORPORATED AFTER THE WORD If SUSPENDED:" - "(WHEN WORK <br />FAILS TO PROGRESS AT.A REASONABLE PACE OR IS HALTED TEMPORARILY, NOT TO <br />EXCEED SIX MONTHS AS PER THE RECORDS OF THE BUILDING OFFICIAL)." <br />BUiLDING DIRECTOR ADAMS CONTINUED THAT IN THE SAME ORDINANCE <br />SECTION 25, SERVICE ENTRANCE STANDARDS, SUB -SECTION (C), HE WISHED TO <br />DELETE THE LAST PHRASE, "FROM WHICH POINT IT SHALL BE SLEEVED FOR <br />MECHANICAL PROTECTION." AND HAVE THIS SECTION READ INSTEAD AS FOLLOWS: <br />It (C) SERVICE MASTS MINIMUM SIZE 11/2 INCH RIGID CONDUIT, <br />WHICH MUST BE PROPERLY SECURED AND HAVE A MINIMUM CLEARING 30 INCHES <br />FROM BOTTOM OF THE CONDUCTORS ABOVE THE ROOF. METER TROUGH SET 5 1/2 <br />FEET TO S FEET FROM FINISHED GRADE." <br />COMMISSIONER SCHMUCKER QUESTIONED SECTION ZZ, SUB -PARAGRAPH (3) <br />WHICH STATES WHEN THE PREMISES IS READY FOR INSPECTION; NOTICE MUST BE <br />GIVEN THE BUILDING OFFICIAL IN WRITING. <br />BUILDING DIRECTOR ADAMS STATED THAT THIS IS HANDLED AS AN <br />ADMINISTRATIVE PROCEDURE AND CAN BE TAKEN CARE OF WITH A TELEPHONE CALL. <br />THE CHAIRMAN ASKED IF ANYONE IN THE AUDIENCE WISHED TO BE HEARD. <br />THERE WERE NONE. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER Loy, <br />THE BOARD UNANIMOUSLY CLOSED THE PUBLIC HEARINGS. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY ADOPTED ORDINANCE NO..77-I0 AMENDING <br />ORDINANCE #74-11, SOUTHERN STANDARD BUILDING CODE, AS CORRECTED BY THE <br />BUILDING DIRECTOR. r� <br />®e <br />