Laserfiche WebLink
Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: BOBBI J SUBDIVISION WATER ASSESSMENT PROJECT <br /> cription: UCP# 2161, WIP#X373-000-169-5.17.00 <br /> Date: May 14,2002 <br /> Bid Bid Item Estimated Unit or Unit Total Labor <br /> Item No. Descri tion <br /> 2 ntity measure Price Price <br /> 1 Mobilization 1 LS $3.000.00 <br /> 2 Maintenance of Traffic 1 LS $1.500.00 <br /> 4 Install 6"PVC Water Main 900 LF $16.00 $14.400.00 <br /> 5 Install 6"Dir.Drill Under Conc.Drive 90 LF $60.00 $5.400.00 <br /> 6 Install DI Restrained Fittings 0.5 TON $5.500.00 $2.750.00 <br /> 7 Install 1"PE Water Service(5 S1.Short) 5 EA. $400.00 $2.000.00 <br /> Install 1"PE Water Service(3 S 1.Lon ) 3 EA. $700.00 $2.100.00 <br /> 8 Install FHA w/6"GV&Tee 1 EA. $2.300.00 $2.300.00 <br /> 10 Remove and Dispose of Asphalt 1 TON $100.00 $100.00 <br /> 11 Install S-3 Asphalt 10 SY $20.00 $200.00 <br /> 12 Replace Rock Base 10 SY $10.00 $100.00 <br /> t14 <br /> Replace Stabilized Subgrade 10 SY $6.00 $60.00 <br /> Select fill20 CY $17.00 $340.00 <br /> Sod and topsoil 900 LF I $2.15 $1.935.00 <br /> 17 Subtotal Water System $36.185.00 <br /> 18 IRCDUS Contingency Account 1 Allowance 1 10%1 $3.618.50 <br /> Total Est. Constr. Cost S39,803.50 <br /> Surveying 1,700.00 <br /> Record Drawings 500.00 <br /> Design 1,000.00 <br /> Bidding& Award 500.00 <br /> Permitting 500.00 <br /> C) <br /> Construction Services 500• '-- <br /> Administration <br /> —v <br /> TOTAL PROJECT COST 45,003.50 <br /> !V <br /> +SJ <br /> �D <br /> ATTACHMENT 3 <br />