My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-079
CBCC
>
Resolutions
>
2000's
>
2005
>
2005-079
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2017 4:30:13 PM
Creation date
9/30/2015 4:26:15 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2005-079
Approved Date
05/17/2005
Agenda Item Number
11.J.3.
Resolution Type
Time and Place (Second Resolution)
Entity Name
Block Villa Subdivision
Area
21st Avenue at 9th Place
Archived Roll/Disk#
3129
Supplemental fields
SmeadsoftID
1639
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: BLOCK VILLAS SUBDIVISION WATER ASSESSMENT PROJECT <br /> cription: UCP#2624, WIP#473-169000-05513 <br /> Date: April 20,2005 <br /> Bid Bid Item Estimated Unit of Unit Total Labor <br /> Item No. Descri tion I QuantityMeasure Price Price <br /> I Mobilization I LS 1 $3,000.00 $3,000.00 <br /> 2 6"X6"Tapping Sleeve&Valve I EA $2,000.00 $2,000.00 <br /> 3 F&I 6"PVC Water Main 400 LF $15.00 $6,000.00 <br /> 3 F&I 4"PVC Water Main 250 LF $9.00 $2,250.00 <br /> 4 F&I 1-1/2"PE Water Service(Dbl Short) 1 EA $600.00 $600.00 <br /> 5 F&I 1-1/2" PE Water Service(Dbl Long) 1 EA $800.00 $800.00 <br /> 6 Install V PE Water Service(Sgl.Short) 5 EA $400.00 $2,000.00 <br /> 7 Install V PE Water Service(Sgl.Long) 2 EA $600.00 $1,200.00 <br /> 8 Install FHA w/6"GV&Tee I EA 1 $3,000.00 $3,000.00 <br /> 9 Sod and topsoil 700 LF $3.00 $2,100.00 <br /> 10 Blow-off Assembly 2 EA $400.00 $800.00 <br /> 11 Subtotal Water System $23,750.00 <br /> 12 IRC Force Account 10% $2,375.00 <br /> Total Est.Constr.Cost $26,125.00 <br /> Surveying 2,200.00 <br /> Record Drawings 1,000.00 <br /> Design 1,500.00 <br /> Bidding&Award 500.00 <br /> Permitting 500.00 <br /> Construction Services 1,500.00 <br /> Administration 1,000.00 <br /> TOTAL PROJECT COST 34,325.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.