Laserfiche WebLink
Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: MEADOWLARK WOODS SUBDIVISION WATER ASSESSMENT PROJECT <br /> cription: UCP# 2324, WIP#473-169000-03521 <br /> Date: April 27,2007 <br /> BidBid Item Estimated Unit of Unit Totat <br /> Item No. IDescription I Quantity I Measure I Price Price <br /> I Mobilization I LS 1 1 $3,000.00 <br /> 2 12"X6"Tapping Sleeve&Valve I EA. $2,100.00 $2,100.00 <br /> 3 F&1 6" PVC Water Main 950 LF $14.00 $13,300.00 <br /> 4 F&I 6"GV&B I EA $900.00 $900.00 <br /> 5 6"Driveway Bores 120 LF $30.00 $3,600.00 <br /> 6 F&I 4" PVC Water Main 250 LF $8.00 $2,000.00 <br /> 7 4"Driveway Bores 50 LF $25.00 $1,250.00 <br /> 8 F&I 4"GV&B 1 EA $700.00 $700.00 <br /> 9 F&I 2"PVC Water Main 160 LF $7.00 $1,120.00 <br /> 10 2"Driveway Bores 20 LF $20.00 $400.00 <br /> 11 F&I 1-1/2"PE Water Service(Dbl Short) I EA $600.00 $600.00 <br /> 12 F&I 1-1/2"PE Water Service(Dbl Long) 4 EA $800.00 $3,200.00 <br /> 13 Install 1"PE Water Service(Sgl.Short) 6 EA $400.00 $2,400.00 <br /> 14 Install V PE Water Service(Sgl.Long) 2 EA $700.00 $1,400.00 <br /> 15 Install FHA w/6" GV&B I EA $3,000.00 $3,000.00 <br /> 16 Subtotal Water System $38,970.00 <br /> 17 Indian River Force Account 10% 1 $3,897 <br /> Total Est.Constr. Cost .$42,867.00 <br /> Surveying 3,700.00 <br /> Record Drawings 1,000.00 <br /> Design 1,500.00 <br /> Bidding&Award 500.00 <br /> Permitting 250.00 <br /> Construction Services 1,500.00 <br /> Administration 1,000.00 <br /> TOTAL PROJECT COST 52,317.00 <br />