Laserfiche WebLink
a <br /> Indian River County Department of Utilities <br /> COST ESTIMATE <br /> Project: CARLL HEIGHTS SUBDIVISION WATER ASSESSMENT PROJECT <br /> wription: UCP#2448, WIP#473-169000-05515 <br /> Date: May 23,2005 <br /> Bid tscription <br /> d Item Estimated Unit of Unit Total Labor <br /> Item No. Iuantity Measure Price Price <br /> I Mobilization I LS 1 $3,000.00 $3,000.00 <br /> 2 F&1 6"PVC Water Main 500 LF $15.00 $7,500.00 <br /> 3 F&I 2"PVC Water Main 250 LF $9.00 $2,250.00 <br /> 4 F&I 6"Driveway Bores 150 LF $30.00 $4,500.00 <br /> 5 F&I 1-1/2"PE Water Service(DbI Short) 2 EA $600.00 $1,200.00 <br /> 6 F&I I-1/2"PE Water Service(DbI Long) 2 EA $750.001 $1,500.00 <br /> 7 Install V PE Water Service(S 1.Short) 3 EA $400.00 $1,200.00 <br /> 8 Install I"PE Water Service(S 1.Lon ) I EA $600.00 $600.00 <br /> 9 Install FHA w/6"GV&Tee I EA $3,000.00 $3,000.00 <br /> 10 Sod and topsoil 1100 LF $3.00 $3,300.00 <br /> 11 IF&I 2"Blowoff Valve I EA $750.00 $750.00 <br /> 12 1 Remove and Repair Asphalt Roadway 10 SY 1 $50.00 $500.00 <br /> 13 Subtotal Water System $29,300.00 <br /> 14 IRC Force Account 10% $2,930.00 <br /> Total Est.Constr.Cost $32,230.00 <br /> Surveying 3,000.00 <br /> Record Drawings 1,000.00 <br /> Design 1,250.00 <br /> Bidding&Award 750.00 <br /> Permitting 750.00 <br /> Construction Services 1,250.00 <br /> Administration 500.00 <br /> TOTAL PROJECT COST 40,730.00 <br />