My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/3/1977
CBCC
>
Meetings
>
1970's
>
1977
>
8/3/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:39 AM
Creation date
6/11/2015 8:48:44 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
08/03/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br />COMMISSIONER SCHMUCKER SUGGESTED THAT WE BUY THE NEW D6 BULLDOZER, <br />REPLACE THE TRAXCUVATOR, BUY ONE NEW TRACTOR -MOWER, AND JUST ELIMINATE <br />REPLACING THE D4 AND BUYING ONE TRACTOR -MOWER,' HE POINTED OUT IF WE DO <br />GO OVER TO THE STATE PROGRAM, WE WILL BE BUYING SOME OF THE EQUIPMENT. <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER <br />LOY, THE BOARD UNANIMOUSLY AUTHORIZED THE ADMINISTRATOR TO ADVERTISE FOR <br />BIDS ON ONE D5 BULLDOZER, ONE 955 TRAXCUVATOR AND ONE TRACTOR WITH MOWER. <br />COORDINATOR THOMAS DISCUSSED REQUEST FOR AUTHORIZATION FOR THE <br />COUNTY TO BORROW UP TO $500,000 IN TAX ANTICIPATION MOTES FOR THE SANITARY <br />LANDFILL, <br />COMMISSIONER LOY ASKED IF THIS WOULD ENCOMPASS THE TOTAL COST <br />AND PUT US INA POSITION TO PAY NOT ONLY THE BILLS WE KNOW OF, BUT ALSO <br />OPERATE AT THE ANTICIPATED COST FOR A PERIOD OF TIME. <br />COORDINATOR THOMAS STATED THAT IT DOES NOT NECESSARILY REPRESENT <br />THE TOTAL COST, NOTING THAT WE HAVE CAPITALIZED FOR THE ENTIRE COST OF ONE <br />YEAR IS OPERATION, EXCEPT FOR THE INTEREST PAYMENTS, WHICH IS THE WAY IT <br />WAS DISCUSSED WITH THE BOND PEOPLE, HE FURTHER POINTED OUT THAT ALTHOUGH <br />WE ARE IN OPERATION NOW, WE DON T HAVE ANY INCOME.. AND HE DOESNIT KNOW HOW <br />LONG IT WILL TAKE AT THIS POINT, THERE IS A TOTAL COST SHOWN OF $1,472,300 <br />BUT HOPEFULLY THERE WILL BE ENOUGH INCOME TO BRING THAT DOWN SO THAT AT THE <br />TIME THE BONDS ARE ISSUED, WE WOULD NOT EXCEED 1.3 MILLION, <br />COMMISSIONER SIEBERT INQUIRED IF THIS INCLUDES THE CONSTRUCTION <br />COST OF TWO NEW CONVENIENCE STATIONS, ONE OF WHICH IS FOR FELLSMERE. <br />COORDINATOR THOMAS NOTED THAT ON THE LAST PAGE OF THE COST ESTI- <br />MATES, THE TWO NEW STATIONS ARE INCLUDED, WHICH INDICATES THAT THEY DON'T <br />EXPECT THEM TO BE BUILT FOR SIX MONTHS, HE ALSO STATED IF THINGS MOVE <br />FASTER, THEY MAY NOT USE THE FULL 9500,000, BUT INDICATED THAT IN DISCUSS- <br />ING THIS WITH ATTORNEY COLLINSTHEY DIDN'T WANT TO HAVE TO COME BACK <br />BEFORE THE BOARD AGAIN. <br />' ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER Loy, <br />THE BOARD UNANIMOUSLY AUTHORIZED THE ATTORNEY TO PREPARE THE NECESSARY <br />DOCUMENTS TO BORROW UP TO $500,000 IN TAX ANTICIPATION NOTES FOR THE SANI- <br />TARY LANDFILL, <br />11 <br />Ali G 3 1 77 soon 0 w,2,'c <br />
The URL can be used to link to this page
Your browser does not support the video tag.