Laserfiche WebLink
RESOLUTION 2004- 13 7 <br />79. In conjunction with the 43rd Avenue extension, the developer shall provide landscape plans that <br />blend landscape improvements along the project's 43rd Avenue and 49th Street frontages with the <br />area of 43rd Avenue located south of 49th Street and within the Gifford Park. Prior to issuance of <br />a land development permit for Phase 2, the developer shall submit and obtain planning staff <br />approval of a landscape plan for these off-site landscape improvements. These off-site <br />landscape improvements shall be completed prior to issuance of a certificate of completion for <br />Phase 2. <br />80. The following external pedestrian improvements are required: <br />Roadway <br />From <br />To <br />Selected Facility <br />491 <br />Street <br />43r <br />Avenue <br />East Property Line <br />8' <br />sidewalk, north side <br />491 <br />Street <br />58t <br />Avenue <br />43r Avenue <br />8' <br />sidewalk, north side <br />53r <br />Street <br />43r <br />Avenue <br />East Property Line <br />5' <br />sidewalk, both sides <br />53r <br />Street <br />58t <br />Avenue <br />43' Avenue <br />5' <br />sidewalk, both sides <br />58t <br />Avenue <br />49t <br />Street <br />North Property Line <br />5' <br />sidewalk, both sides <br />43r <br />Avenue <br />49t <br />Street <br />53r Street <br />5' <br />sidewalk, both sides <br />81. All internal streets shall have 5' wide sidewalks on both sides, with an 8' wide pedestrian path <br />connection stub -out to the school site. Along 51St Court from 49th Street to 53rd Street, 8' wide <br />sidewalks shall be provided on both sides. Recreation paths shall be provided within the <br />preserve areas and limited public access allowed (e.g. scheduled tours) in coordination with the <br />Waterway Village Management. All sidewalk and pedestrian path improvements shall be <br />depicted on all land development permit plans. <br />82. The neighborhood commercial area shall be subject to architectural standards that are consistent <br />with the residential development and generally consistent with the SR60 corridor criteria, <br />including the monument sign criteria. The developer shall obtain planning staff approval of <br />architectural plans for all buildings and signs with the neighborhood commercial area. <br />83. A street tree planting plan shall be provided with each preliminary PD plan, and the developer <br />shall obtain planning staff approval of the street tree planting plan. <br />84. The developer shall explore locations for transit/bus stops with each preliminary design phase <br />of the PD. Transitibus stop improvements may be required. <br />85. An annual report shall be filed November 1St of every year after adoption of the DO and shall <br />contain the following: <br />a. A description of changes in the plan of development, or in the phasing for the reporting <br />year and for the next year. <br />b. A summary comparison of development activity proposed and actually conducted for <br />the year. <br />FACommunity Development\Users\CurDev\RESOLUTION\2004 Resolutions\Waterway Village Resoluation 2004-.rtf 18 <br />