Laserfiche WebLink
i <br />Accounts, Records, and Audit Reports Required: <br />The County will be required to keep accounts and records on the operation <br />of the facility separate and apart from other records in accordance with the <br />bond ordinance. We suggest that the County's auditing firm develop a <br />set of records for this particular purpose unless adequate records are already <br />in use. The person responsible for maintaining such records of accounts will ` <br />be selected prior to loan closing. <br />It is imperative that the County establish and maintain adequate business <br />management practices through a system of records,.reports and`'audits which <br />will assist the governing body in making effective decisions and thus help <br />to insure a successful operation. <br />FmHA will.be furnished management reports as outlined in Appendix A of <br />FmHA Instruction 1933-A, Paragraph 1933.17. A copy of this appendix is <br />attached along with copies of our forms to be used for periodic and annual <br />reports. <br />Prior to loan closing the County will enter into a contract with a qualified <br />auditor to conduct the annual audit. Requirements pertaining to audit reports <br />are contained in a booklet, "FmiiA Instructions to Independent Certified Public <br />Accountants and Licensed Public Accountants." Two copies of this booklet are <br />attached. Please refer to page 10 of the booklet for an example of an auditor - <br />borrower written agreement. FmHA will approve the County's accounting financial <br />reporting system prior to loan closing or commencing construction whichever <br />occurs first. <br />All forms needed for required FmHA reports will be furnished by this office. <br />Construction Contract Documents and Bidding:-= <br />Appendix B of FmHA Instruction 1933-A and Contract Documents for Construc- <br />tion of Federally assisted Water and Sewer Projects will be followed by the <br />County and engineer for all construction. Two copies each of these documents <br />are attached and one copy is to be delivered to your engineer and attorney. <br />A pre -construction conference will be held after bid opening at a convenient <br />time to be scheduled by FmHA. In attendance will be the designated repre- <br />sentatives of the County, the consulting engineer, contractors' representatives > <br />and FmHA personnel. - <br />p <br />' ? <br />Insurance and Bonding: <br />Property insurance, fire and extended coverage and flood plain insurance, F' <br />if applicable, will be required on all above -ground structures including <br />equipment and machinery in an amount equal to the replacement value as <br />e project engineer and approved b the FmHA. No insurance <br />recommended b th g pP Y <br />Y P ] <br />will be required on water reservoirs, standpipes and elevated tanks. <br />- i E <br />tff <br />d <br />r iii[ <br />} <br />R�tK 31 FAJr 49 <br />l r <br />SEP �a� <br />r+l <br />