My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9/14/1977
CBCC
>
Meetings
>
1970's
>
1977
>
9/14/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:40 AM
Creation date
6/11/2015 8:53:59 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
09/14/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MRs WRIGHT CONTINUED THAT HE BELIEVED THAT THE PEOPLE TESTIFYING HERE <br />TODAY IN REGARD TO THE QUALITY OF THE WATER ARE CERTAINLY SPEAKING THE <br />TRUTH AND HE BELIEVES THE SAMPLES THEY HAVE BROUGHT ARE WHAT THEY SAY <br />THEY ARE; BUT HE IS SURPRISED BY THE QUALITY OF THE WATER AS HE HAS NOT <br />BEEN AWARE OF ANY COMPLAINTS MADE BY CUSTOMERS EITHER TO HIM OR TO <br />MR. OVERSTREET. MR, WRIGHT THEN INFORMED THOSE PRESENT THAT ANYONE <br />WITH A COMPLAINT COULD CALL.THE OFFICE OF MR. OVERSTREET COLLECT AT <br />(305) 644-3964 OR HIS OWN OFFICE COLLECT AT (305) 274-5211. HE ASSURED <br />THE BOARD THAT THESE MATTERS WILL BE ATTENDED TO. <br />MR. WRIGHT NOTED THAT THE PROBLEM OF THE WATER QUALITY AND <br />WATER SUPPLY ARE SOMEWHAT RELATED, HE STATED THAT THE WATER SUPPLY AT <br />THIS LOCATION IS EXTREMELY LIMITED AND THERE IS NO OTHER SOURCE OF WATER <br />IN THAT AREA. HE CONTINUED THAT IN ORDER TO GET THE SAME QUALITY OF <br />WATER AS THE CITY OF VERO BEACH PROVIDES WOULD MEAN INSTALLING A <br />COMPLETE SAND FILTRATION PLANT AND WOULD REQUIRE SEVERAL PERSONNEL <br />THROUGHOUT THE YEAR TO MAINTAIN AND OPERATE THE PLANT, MR. WRIGHT <br />INFORMED THE BOARD THAT THEIR ENGINEERS DID LOOK INTO THIS, AND <br />IT WOULD COST APPROXIMATELY $400,000'TO BUILD SUCH A PLANT AND ABOUT <br />$68,000 A YEAR TO OPERATE IT, WHICH WOULD BE VERY EXPENSIVE. HE <br />FURTHER NOTED THAT BECAUSE OF THE LIMITED SUPPLY OF WATER, NO NEW <br />CUSTOMERS CAN BE ADDED TO HELP DEFRAY THE EXPENDITURE. MR. WRIGHT <br />ESTIMATED THAT A CAPITAL EXPENDITURE OF THIS AMOUNT TO BUILD,SUCH <br />A PLANT WOULD RESULT IN A COST TO THE CUSTOMER OF APPROXIMATELY $40.00 <br />PER YEAR WITHOUT TAKING INTO CONSIDERATION THE PERSONNEL TO RUN THE <br />PLANT. HE INFORMED THE BOARD THAT IN TALKING WITH CITY MANAGER LITTLE <br />ABOUT THE POSSIBILITY OF OBTAINING WATER FROM THE CITY, IF THEY ARE <br />LEGALLY ABLE TO DO THIS, THE CITY WOULD REQUIRE A $400,000 CONNECTION <br />CHARGE. <br />ATTORNEY GATLIN ASKED MR. WRIGHT IF HE IS SAYING THAT EITHER <br />OF THESE ALTERNATIVES IS UNECONOMICAL FOR BOTH CUSTOMER AND UTILITY. <br />17 <br />SEP 14 1977 <br />ROCiK 31 PAG) F 46 <br />
The URL can be used to link to this page
Your browser does not support the video tag.