My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/19/1977 (2)
CBCC
>
Meetings
>
1970's
>
1977
>
10/19/1977 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:41 AM
Creation date
6/11/2015 9:05:04 AM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IT IS PRECISE WORK AND REQUIRES CLOSE TOLERANCES. <br />ENGINEER BEINDORF AGREED, POINTING OUT THAT IT IS AN ELEC- <br />TRONIC TYPE OF SCALE PIT AND THEREFORE, THE TOLERANCES ARE CRITICAL. <br />CHAIRMAN WODTKE NOTED THAT THE BIDDER SAYS HE WILL COMMENCE <br />WORK WITHIN IO DAYS OF THE AWARDING OF THE CONTRACT AND COMPLETE IT <br />WITHIN 25. <br />ENGINEER BEINDORF FELT THAT THE TIMING IS ALSO A CRITICAL <br />ELEMENT TO CONSIDER AND ADDED THAT MANY OF TAE CONRTACTORS HE TALKED <br />TO WERE VERY BUSY AND WOULD NOT BE ABLE TO MEET SUCH A TIME FRAME. <br />COMMISSIONER SIEBERT ASKED IF THE ADMINISTRATOR AND THE <br />CONSULTING ENGINEER WERE SATISFIED THAT THIS IS A FAIR BID AND <br />DOESNIT NEED ANY FURTHER EVALUATION. <br />THE ADMINISTRATOR AND ENGINEER BEINDORF AGREED THAT THEY <br />WOULD RECOMMEND ACCEPTING THE BID, ESPECIALLY IN VIEW OF THE CRITI- <br />CAL TOLERANCE INVOLVED AND THE TIMING , BUT SUGGESTED THAT THEY RE- <br />VIEW THE DOCUMENTS SUBMITTED TO SEE THAT EVERYTHING IS IN ORDER AND <br />REPORT BACK LATER IN THE MEETING, <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />10 <br />� I I <br />LOO Ala <br />
The URL can be used to link to this page
Your browser does not support the video tag.