My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/1977
CBCC
>
Meetings
>
1970's
>
1977
>
10/20/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:41 AM
Creation date
6/11/2015 9:08:27 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
10/20/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
distribution system to serve adjacent built-up areas. As shown on <br />Exhibit 1, there are six areas which may be considered. The following <br />table gives the number of potential customers that may be served in <br />each area and the estimated • t d construction .cost, excluding meter in - <br />IV stallations. Meter costs should be paid by the individual customers <br />as discussed in Section V.D. <br />No. Potential Customers Estimated <br />Area Residential Commercial Construction Costs* <br />A 90** 20** $ 83,300 <br />B 10 0 3,400 <br />C 35 0 7,500 <br />D 19 2 <br />7,700 <br />E 88 5 25,100 <br />F 14 0 <br />1,500 <br />* Less meter costs. $128,500 <br />** Approximate count. <br />The County should advertise for and receive applications to in- <br />stall water meters prior to initiating construction work in any of <br />the above designated areas. This procedure would establish the rela- <br />tive demand for water service in each area and the number of water <br />meters to be installed.. <br />7 <br />I � <br />OCT 2 0 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.