Laserfiche WebLink
E: <br />M' <br />• <br />gpd sewage treatment plant and disposal of the treated wastes <br />.by Iand.application, and; (2) construction of a new lift station and <br />force main to discharge the raw sewage to the City of Vero Beach's <br />sewage system. Under the latter arrangement, the City would treat <br />and dispose of the sewage under the 1973 City -County Agreement <br />whereby the County is allotted up to 1,390,000 gallons per day of.the <br />City's treatment capacity. <br />B Construction of New Sewage Treatment and Disposal Facilities <br />A new sewage treatment and disposal facility could be constructed <br />near the existing facility as shown on Exhibit 2. Additional acreage <br />will be.required for the disposal site. The existing 200 gpm lift <br />station is adequate, but the 4" force main would require extension <br />to the new plant. <br />The new facility would include a precast contact stabilization <br />sewage treatment plant rated at 100,000 gpd, sludge drying beds, a <br />chlorinator, a 300,000 gallon oxidation pond, and percolation ponds <br />rated at not more than three inches per day percolation rate. Site <br />investigations will be required to establish the design rate. The <br />site will be fenced and housing provided for the chlorinator and <br />controls. <br />Estimated construction cost of the new facility, including real <br />estate and site investigation work, is $223,000. <br />C Discharge to Vero Beach's Sewage System <br />Although we have not yet obtained confirmation from the City of <br />Vero Beach, there appear to be two options available under this <br />OCT 2 0.1977 <br />10 <br />BOOM OJJL pg f <br />