Laserfiche WebLink
VI. RECOMMENDATIONS <br />The Phase I and Phase II water and sewer projects described in this <br />report present an economically viable program for providing an adequate <br />water supply to the Gifford area and for solving treatment and disposal <br />problems connected with the existing sewerage facilities. Recommendations <br />for implementing the Phase II program are incorporated in the report text <br />and include the following. <br />1. The County should obtain agreement with the City of Vero Beach <br />on the point of connection to the City's sewerage system, and <br />the City should inform the County of City's current sewage <br />treatment costs. <br />2. The Engineers should be authorized to prepare construction <br />drawings for the Phase II program. <br />3. Agreement should be reached with a contract operator for sys- <br />tem operation and maintenance. <br />4.. The rate schedules and other charges given in the report should <br />be adopted. <br />5. The program should be advertised throughout the Gifford area <br />and applications solicited for new connections to the water <br />system. <br />19 <br />0 CT 2 0 19 77 - <br />MOK A PAU,F •!� <br />. <br />