My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/16/1977
CBCC
>
Meetings
>
1970's
>
1977
>
11/16/1977
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:28:42 AM
Creation date
6/11/2015 9:27:11 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/16/1977
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />COUNTY CONSULTING ENGINEER JAMES BEINDORF CAME BEFORE THE <br />BOARD TO <br />REPORT ON THE CONTRACTS FOR THE GIFFORD WATER PROJECT. HE <br />NOTED THAT IT IS REQUIRED THAT 10% OF THE EDA GRANT MONEY BE AWARDED <br />TO MINORITY SUBCONTRACTORS. THE TWO PROPOSED MINORITY CONTRACTORS ARE <br />MINORITY SYSTEMS, INC., A PLUMBING CONTRACTOR, WHO WOULD WORK ON THE <br />F <br />PUMPING STATION, AND MACK ADAMS CONSTRUCTION CO., A PAINTING CONTRACTOR, <br />WHO WOULD PAINT THE WATER TANK. MR. BEINDORF STATED THAT HE AND INTER- <br />. F <br />GOVERNMENTAL COORDINATOR THOMAS HAVE DONE EXTENSIVE CHECKING IN ORDER j <br />JO BE ASSURED THAT THESE FIRMS ARE APPROVED MINORITY CONTRACTORS AND <br />BELIEVE THAT THESE FIRMS,WILL BE WITHIN THE EDA LIMITS. HE, THEREFORE, <br />RECOMMENDED THAT THE BOARD NOW SIGN THE CONTRACTS AS AWARDED AT THE <br />MEETING OF NOVEMBER 2ND. <br />CHAIRMAN WODTKE ASKED ABOUT THE FEDERAL WAGE RATES, AND 000RDI- <br />NATOR THOMAS STATED THAT THESE ARE INCLUDED IN THE CONTRACTS. <br />ON MOTION BY COMMISSIONER Loy, SECONDED BY COMMISSIONER <br />SCHMiUCKER, THE BOARD UNANIMOUSLY ACCEPTED THE CONTRACT WITH PDM HYDRO <br />STORAGE, INC., FRANKLIN, TENNESSEE, FOR THE ELEVATED STORAGE TANK FOR <br />THE GIFFORD WATER PROJECT, IN THE AMOUNT OF $336,500.00 AND AUTHORIZED <br />THE SIGNATURE OF THE CHAIRMAN. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY ACCEPTED THE CONTRACT WITH WIDELL ASSOCIATES, <br />INC., FT. LAUDERDALE, FLA., FOR THE PUMP STATION AND TRANSMISSION MAIN <br />FOR THE GIFFORD WATER PROJECT, IN THE AMOUNT OF $228,260.00, AND AUTHOR- <br />IZED THE CHAIRMAN'S SIGNATURE. <br />THESE CONTRACTS ARE ON FILE IN THE OFFICE OF THE ADMINISTRATOR. <br />ENGINEER BEINDORF NEXT DISCUSSED WITH THE BOARD PHASE II OF <br />THE GIFFORD WATER PROJECT, AND CHAIRMAN WODTKE NOTED THAT THE ENGINEER <br />NEEDS AUTHORIZATION FROM THE COMMISSION TO NEGOTIATE WITH THE CITY <br />OFFICIALLY ON THE SEWAGE ASPECT AND DEVELOP SOME COST ESTIMATES AND <br />ENGINEERING PLANS. <br />ENGINEER BEINDORF EXPLAINED THAT THIS WOULD BE FOR SERVICING <br />THE AREA WITHIN THE GIFFORD COMMUNITY AS WELL AS COMPLETING THE NECESSARY <br />-. PLANS AND SPECIFICATIONS FOR UPGRADING THE OLD UDU LINE. HE NOTED THAT <br />THEY NEED TO START PUTTING TOGETHER PLANS AS TO WHERE WE CAN TIE INTO <br />THE CITY SYSTEM. <br />NOV 16 1977 . <br />L_ <br />33 <br />B00 32 ; <br />
The URL can be used to link to this page
Your browser does not support the video tag.