Laserfiche WebLink
THE CORNER OF C & G GROVES. THE ADMINISTRATOR STATED THAT HE HAS IN- <br />SPECTED THIS SITE, AND IT WOULD ACTUALLY ENTAIL BUILDING 1/11 MILE OF <br />ROAD. HE'NOTED THAT WE WOULD HAVE TO GET PERMISSION FROM THE DRAINAGE <br />DISTRICT TO REGRADE AND TAKE THE SMALL AMOUNT OF SPOIL THEY HAVE THERE. <br />IT WOULD ALSO REQUIRE THE REMOVAL OF QUITE A FEW CABBAGE PALMS, AND <br />MARL WOULD HAVE TO BE HAULED IN. <br />COMMISSIONER Loy POINTED OUT THAT THE SOLE PURPOSE OF THIS <br />ROAD IS TO HAUL OUT FROM ONE GROVE, AND IN THE PAST OWNERS NEEDING TO <br />'HAUL PRODUCE HANDLED THEIR OWN ROADS. <br />ADMINISTRATOR .JENNINGS AGREED THAT IN THE PAST THE OWNERS <br />WOULD BRING THEIR ROADS UP TO THE STANDARD OF A RURAL ROAD, WOULD GIVE <br />A RIGHT-OF-WAY, AND THE COUNTY WOULD THEN AGREE TO MAINTAIN THEM, BUT <br />THERE HAS BEEN A TENDENCY TO GET AWAY FROM THIS. <br />CHAIRMAN WODTKE SUGGESTED THAT THE OWNERS BE NOTIFIED IF THEY <br />WILL CLEAR AND BRING THE ROAD UP TO MINIMUM STANDARDS, THE COUNTY WILL <br />MAINTAIN IT. IT WAS AGREED THAT COMMISSIONER SIEBERT WILL DISCUSS <br />THIS MATTER WITH MR. STREETMAN AND REPORT BACK TO THE BOARD. <br />THE ADMINISTRATOR REPORTED THAT HE TRAVELED TO FORT LAUDERDALE <br />AND MET WITH THE DOT AS AUTHORIZED., HE STATED THAT HE IS UNDER THE <br />IMPRESSION THAT THE COUNTY WILL RECEIVE DEFINITE INSTRUCTIONS FAIRLY <br />• SOON ABOUT TURNING THE SECONDARY ROADS OVER TO THE COUNTY AS WE ARE ONE <br />OF THE VERY FEW REMAINING COUNTIES WHERE THIS HAS NOT BEEN DONE. <br />• ADMINISTRATOR JENNINGS CONTINUED THAT IN REGARD TO THE OFF - <br />SYSTEMS ROAD CONSTRUCTION, HE TOOK WITH HIM THE LIST REVIEWED AT THE <br />PREVIOUS MEETING AND WENT OVER IT WITH THE DOT ITEM BY ITEM, POINTING <br />OUT TO THEM THAT THE ROAD TO THE COLLEGE IS THE FIRST PRIORITY. HE <br />INFORMED THE BOARD THAT THE DOT HAS NOT YET RECEIVED FULL INSTRUCTIONS <br />ON THE CRITERIA THEY WILL HAVE.TO IMPOSE NOR DO THEY KNOW EXACTLY HOW <br />MUCH MONEY WILL BE AVAILABLE. THEY ARE GOING TO SEND TWO OF THEIR <br />STAFF PEOPLE TO INDIAN RIVER COUNTY TO VISIT THE VARIOUS PROPOSED <br />PROJECT LOCATIONS WITH THE ADMINISTRATOR, AND HE FEELS SURE WE WILL <br />GET SOMETHING. <br />THE ADMINISTRATOR THEN REVIEWED THE PROPOSED NEW CONSTRUCTION <br />ON STATE ROAD 512 FROM WEST OF STATE ROAD 507 TO I-95. HE NOTED THAT <br />11 <br />NOV 16 1977 <br />5 <br />BOOK <br />32 fux <br />