Laserfiche WebLink
t <br />DEC 71977 <br />CHAIRMAN WODTKE NOTED THAT THIS BASICALLY GIVES THE ENGINEER <br />THE AUTHORITY TO GO ABOUT DETERMINING THE AVAILABILITY OF WATER,, ETC.. <br />AS DISCUSSED, <br />ENGINEER BEINDORF STATED THAT IF TEST TELLS ARE NEEDED, HE <br />WILL COME BACK TO THE BOARD AS THIS WILL REQUIRE SOME EXPERTISE. <br />THE CHAIRMAN CALLED FOR THE QUESTION., IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />ASSISTANT ADMINISTRATOR NELSON PRESENTED TO THE FOARD PROPOSAL <br />FROM DICKERSON, INC., IN REGARD TO OVERSIZING THE LINE AT THE SEWER <br />PLANT WHICH THE 6" LINE FROM VERO MALL WILL TIE INTO. <br />ENGINEER BEINDORF NOTED THAT THIS LINE WILL GO EASTWARD AROUND <br />THE SEWER PLANT AND TIE IN ON THE NORTH OF THE PLANT. HE INFORMED THE <br />BOARD THAT ORIGINALLY THIS WAS TO BE A 3" LINE, BUT HE FEELS IT IS WISE <br />TO PUT IN AN 8" LINE NOW, LOOKING TOWARDS THE TIME WHEN WE OVERCAPACITATE <br />THE 6" LINE. <br />DISCUSSION CONTINUED IN REGARD TO THE VARIOUS LINE SIZES. <br />ADMINISTRATOR JENNINGS INFORMED THE BOARD THAT THIS WORK IS <br />BEING DONE UNDER A STATE CONTRACT AND DICKERSON, INC., SUBS UNDER THE <br />PRIME CONTRACTOR SO IT IS NOT REALLY A COMPETITIVE SITUATION. THEIR <br />FIGURES ARE BASED ON THOSE USED IN THE STATE CONTRACT, <br />THE BOARD FELT THE $9,000 PROPOSAL FOR OVERSIZING THE LINE <br />WAS HIGH, BUT AGREED THERE WAS NO ALTERNATIVE BECAUSE IF WE DELAY TOO <br />LONG, THEY WILL GO AHEAD WITH THE 3" LINE. <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONEP <br />SIEBERT, THE BOARD UNANIMOUSLY ACCEPTED DICKERSON'S PROPOSAL OF $9,219.25 <br />TO OVERSIZE THE LINE TO THE SEWER PLANT FROM OUR METER PIT TO AN 8".LINE <br />AND AUTHORIZED THE SIGNATURE OF THE CHAIRMAN TO THE PROPOSAL, <br />gm <br />