Laserfiche WebLink
p <br />CONSTRUCTION MATERIALS RECEIVED AT THE LANDFILL BE CHARGED AT THE RATE <br />OF $6.00 A TON AND ANYTHING OVER THAT WOULD. BE AT A LESSER RATE. <br />CHAIRMAN WODTKE ASKED WHAT AFFECT IT WOULD HAVE ON THE BONDS <br />IF THE RATE STRUCTURE WAS SET UP WITH A REQUIREMENT THAT IT MUST BE RE- <br />VIEWED IN A SIX-MONTH PERIOD OF TIME, OR ;IF WE ADOPTED A RATE LESS <br />THAN THE ONE PROPOSED. <br />MR. SCHNEIDER DID NOT FEEL REVIEW OF THE RATE`STRUCTURE <br />WOULD HAVE AN ADVERSE AFFECT, BUT AS TO LOWER RATES, POINTED OUT THE <br />COUNTY IS LEGALLY REQUIRED TO PROCEED WITH THE ENGINEERS'RECOMMENDATION. <br />COMMISSIONER SIEBERT DISCUSSED VARIOUS ALTERNATIVES AND ASKED <br />IF AT A FUTURE DATE WE COULD HAVE A REFERENDUM ASKING PEOPLE TO TAX <br />THEMSELVES TO REDUCE LANDFILL RATES. <br />MR. SCHNEIDER STATED THAT THE BOARD HAS FLEXIBILITY IN REGARD <br />TO THE WAY THEY RAISE THE MONEY. <br />COMMISSIONER SIEBERT REMINDED THOSE PRESENT THAT THE BOARD <br />WAS UNDER THE SEVEREST PRESSURE TO GET THIS LANDFILL IN OPERATION, <br />AND IT WILL NEED A LOT OF REFINEMENT BEFORE IT GETS TO A POINT -WHERE <br />IT IS AS EQUITABLE AS WE CAN MAKE IT. <br />MR. PRICE STATED THAT HE FELT THE STUDY HAS BEEN MADE MORE <br />ON -HOUSEHOLD RUBBISH THAN ON CONSTRUCTION DEBRIS. HE POINTED OUT THAT <br />WHAT. YOU ARE TALKING ABOUT IS BURYING VOLUME IN A HOLE, AND TONNAGE AND <br />VOLUME ARE TWO ENTIRELY DIFFERENT IDEAS. MR. PRICE CONTINUED THAT THE <br />MINIMUM CHARGE FEE FOR TAKING A SMALL PACKAGE TO THE LANDFILL SHOULD <br />NOT BE BASED ON VEHICLE TYPE, AND IN REGARD TO TIRES, HE FELT IT <br />WOULDNIT TAKE A WHOLE LOT OF TIRES AT $20.00 PER TON FOR THE COUNTY <br />TO PURCHASE A GRINDING MACHINE AND SELL THIS MATERIAL. <br />COMMISSIONER LOY NOTED THAT RESEARCH.HAS BEEN DONE ON THIS <br />.r <br />AND THERE WILL BE ADDITIONS TO THE LANDFILL AS WE GET GOING TO RECYCLE <br />AS MUCH AS POSSIBLE. <br />DEC 2 11977 , <br />25 <br />F <br />, <br />Boaz 33 PuE 8i <br />