Laserfiche WebLink
The District shall, at least every two (2) years, cause <br />to be prepared by the Consulting Engineers a report or survey with <br />respect to the management of the System, the sufficiency of the <br />special assessments, fees and other charges in connection with the <br />System, the proper maintenance of the System and the necessity for <br />capital improvements and recommendations therefor. Such a report <br />or survey shall also show any failure of the District to perform or <br />comply with the covenants herein contained. <br />If any such report or survey of the Consulting Engineers <br />shall set forth that the provisions hereof or any reasonable <br />recommendations of the Consulting Engineers have not been complied <br />with, the District shall immediately take such reasonable steps as <br />are necessary to comply with such requirements or recommendations. <br />In making such report or survey the Consulting Engineers shall <br />accept certified statements of the independent certified public <br />accountants for the District. Copies of each report or survey <br />shall be placed on file with the District and shall be open to the <br />inspection of any Registered Owner of the Bonds or other interested <br />party. <br />During the period of construction of the 1988 Project, <br />the Consulting Engineers shall determine that all phases of the <br />1988 Project are being constructed pursuant to the plans and <br />specifications, monitor the progress of such construction, approve <br />the form and content of construction contracts signed by the <br />District, including any penalty payments required as a result of <br />non-performance, and the payment bonds required, arrange for proper <br />permits, clearance of other construction documents as may be <br />necessary from local, state or federal jurisdictions, and approve <br />expenditures from the Construction Fund, as hereinafter provided. <br />When each phase of the 1988 Project has been <br />substantially completed and placed in operation and use, the <br />Consulting Engineers shall certify such fact to the District and <br />the same shall be deemed to be the completion date of such phase of <br />the 1988 Project. <br />The Consulting Engineers shall also prepare a monthly <br />progress report showing the status of the construction and <br />acquisition of the 1988 Project, the construction contracts entered <br />into therefor, an estimated time schedule for completion, the <br />percentage of completion thereof, the estimated cost of completion <br />of the 1988 Project and any other matters deemed advisable by the <br />Consulting Engineers. <br />O. NO COMPETING SYSTEMS. To the full extent permitted <br />by law, the District will not grant, renew or cause, consent to, or <br />allow the granting, renewal, extension or expansion of any <br />franchise or permit to any person, firm, corporation or body, or <br />agency or instrumentality whatsoever, for any system similar to <br />21 <br />