My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/22/1978
CBCC
>
Meetings
>
1970's
>
1978
>
2/22/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:06 AM
Creation date
6/11/2015 10:08:09 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/22/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_ M <br />FEB 2 21973 <br />I.' SCOPE OF SERVICES <br />The Consultant shall perform and carry out in a satisfactory and proper <br />'manner all necessary services provided under this Contract as required <br />by the County in connection with its Community Development Program. In <br />,addition, this Scope of Services provides for continuing services to <br />be available to the County through the end of FY 1978-79 to advise and <br />assist the Community Development staff with planning, implementation <br />and .management activities. The continuing services will be provided <br />only upon request, and the County will be charged only for those services <br />so requested. <br />The Consultant will provide advice and assistance, or assume responsibi- <br />lity for specific activities in accordance with the following Scope of <br />Services: <br />A. Preapplication <br />1. Scheduling and Control <br />The Consultant,in close coordination with the local staft will <br />prepare a work program and schedule of activities in written <br />and/or graphic form indicating the steps which must be under - <br />..taken and completed to produce an acceptable preapplication for <br />Community Development Block Grant funding within the time avail- <br />able. The schedule of activities will indicate projected com- <br />pletion dates and latest allowable completion dates of each <br />separably identifiable element in the program. The schedule <br />will also indicate the division of primary responsibilities <br />between the County and the Consultant, and be prepared in a <br />format which will facilitate control of the work program by <br />the County in meeting established deadlines. <br />2. Preapplication Document <br />Theā¢Consultant,.in coordination with the County, will prepare <br />the County's Preapplication for a Comprehensive Grant (either <br />single or multi-year) or Single Purpose Grant, as deemed appro- <br />Page 2 of 15 <br />Boa 34 PAce 5 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.