My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-004
CBCC
>
Resolutions
>
2010's
>
2013
>
2013-004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2018 11:40:26 AM
Creation date
9/30/2015 6:04:34 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
2013-004
Approved Date
01/15/2013
Agenda Item Number
12.J.i
Resolution Type
Utilities
Subject
Water and Sewer Rates, Fees, Reclaimed Water, Amendment to Rate Schedule
Supplemental fields
SmeadsoftID
11704
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RESOLUTION 2013 - <br /> Reclaimed Water — Per 1 .000 Gallons <br /> Effective January 1 , 2011 $ 0 . 60 <br /> Effective January 1 , 2012 $ 0 . 67 <br /> Effective January 1 , 2014 $ 0 . 74 <br /> Effective January 1 , 2015 $ 0 . 81 <br /> Effective January 1 , 2016 $ 0 . 88 <br /> Sludge and Segtage Rates W <br /> Charge Per 1 , 000 Gallons (a) $30. 82 <br /> Charge Per Wet Ton ( b) $ 7 . 51 <br /> One Time Dump Feefor R=eational Vehide(s) — Per Dump $10. 00 <br /> (a) Recommended rates assume domestic sludge with solids concentration of between . 5 and 2. 0 percent . <br /> ( b) Costs incurred by County to sample, monitor and/or test wastes to verify solids concentrations, metals, <br /> content , etc. , or additional costs incurred to handle or dispose of wastes with high metal concentrations <br /> or other non-domestic waste characteristics should be recovered from the users discharging the wastes in <br /> addition to the above charges based on formula' s available in the Department of Utility Services. <br /> IMPACT FEE Ifformerly known as CAPACITY CHARGEI <br /> Water — Per ERU <br /> Water Treatment $ 320. 00 <br /> Water Transmission $ 980. 00 <br /> Total $ 1 , 300. 00 <br /> Sewer — per ERIJ <br /> Wastewater Treatment $2 , 087 . 00 <br /> Wastewater Transmission $ 709 . 00 <br /> Total $2 , 796 . 00 <br /> Line Extension Charges <br /> Main Extension — Water <br /> Per foot measured along front of property served $ 11 . 25 <br /> Main Extension — 83wer and Sewer Laterals <br /> Per foot measured along front of property served $15.77 <br /> (Note. Charge doubles if service available on one side only, minimum of 50-feet <br /> per E RQ maximum of 100-feet per ERS <br /> Other Charges <br /> Deposits — Required upon Opening, transferring or Reconnecting SBrvioe <br /> Residential and Commercial — Per ERU $50 . 00 <br /> Hydrant Meter $345 . 00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.