Laserfiche WebLink
0 <br />a <br />NOTED THAT WE WILL HAVE TO CONTACT THE DER, THE ST. .JOHNS WATER MANAGE- <br />MENT DISTRICT, ETC., BUT POINTED OUT. THAT IT ALL STARTS WITH THE GEOLO- <br />GIST. <br />CHAIRMAN WODTKE ASKED IF A STUDY OF HOBART PARK WOULD BE <br />SUFFICIENT AS HE FELT WE NEED TO CHECK INTO OTHER POTENTIAL AREAS. <br />MR. BEINDORF FELT SUCH.A STUDY WOULD BE FINE FOR THE NORTH <br />PART OF THE COUNTY AND STATED THAT MR. AMY IS OPTIMISTIC ABOUT THE <br />HOBART PARK AREA. HE CONTINUED THAT THEY NEED SOME GUIDELINES BECAUSE <br />HE HAS NOT SPENT ANY MONEY SO FAR AND DOESNIT WANT TO.UNTIL IT CAN <br />BE DIRECTED TO THE BEST USE, MR, BEINDORF INFORMED THE BOARD THAT <br />MR, AMY WOULD PUT DOWN TEST WELLS AS HE DID FOR THE CITY AND, AS TO A <br />TIME FRAME, HE HAS INFORMED MR, AMY THAT WE WILL NEED SOMETHING BY <br />THE MIDDLE OF THE SUMMER, <br />CHAIRMAN WODTKE ASKED IF IT WOULD BE NECESSARY TO ADVERTISE <br />FOR THESE SERVICES OR WHETHER WE CAN JUST HIRE MR. AMY. <br />ATTORNEY COLLINS STATED THAT AS LONG AS MR, AMY DOES NOT HOLD <br />HIMSELF OUT AS AN ENGINEER, BUT STRICTLY A GEOLOGIST, THERE IS NO <br />PROBLEM AND WE NEED NOT ADVERTISE. <br />CHAIRMAN WODTKE AGREED THAT WE NEED TO PROCEED WITH THIS STUDY <br />AND STATED HE WOULD LIKE AUTHORIZATION TO PROCEED AND HAVE A PROPOSED <br />CONTRACT DRAWN UP. <br />ENGINEER BEINDORF STATED THAT HE COULD HAVE MR. AMY MEET WITH <br />THE CHAIRMAN, THE ADMINISTRATOR AND HIMSELF, IF DESIRED, AND ASK HIM TO <br />WRITE A PROPOSAL TO THE COUNTY. <br />THE BOARD AGREED THAT THE ADMINISTRATOR AND ENGINEER BEINDORF <br />AND EITHER THE CHAIRMAN OR COMMISSIONER SCHMUCKER SHOULD PROCEED AS <br />SUGGESTED BY MR. BEINDORF. <br />MR, BEINDORF NEXT DISCUSSED EXPEDITING THE PLANS AND SPECIFICA- <br />TIONS FOR RENOVATION OF THE GIFFORD WATER SYSTEM. HE NOTED THAT AS <br />PART OF THE ORIGINAL CONTRACT, ABOUT $34,000 TOTAL COST WAS ESTIMATED <br />FOR THE RENOVATION AND RETAINING A.FIRM TO MAKE A LEAKAGE SURVEY. <br />HE CONTINUED THAT THEY NOW FEEL THE BEST THING WOULD BE TO GET THE <br />SURVEY DONE PRIOR TO PUTTING THE BIDS OUT SO THAT THE CONTRACTORS WOULD <br />BID ON REPAIRING ONLY THE EXISTING LEAKS. HE, THEREFORE, SUGGESTED <br />THAT THIS SEGMENT BE TAKEN OUT OF THE ORIGINAL CONTRACT AND MADE A <br />PART OF "EXTRA SERVICES." THE ENGINEERS THEN WOULD PAY PITOMETER & <br />39 <br />Rcb 3-4 -PA-UF 160 <br />