Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY AUTHORIZED THE ATTORNEY TO DRAW UP A CONTRACT <br />WITH LLOYD AND ASSOCIATES IN THE AMOUNT OF $4,300 TO DECIDE WHERE THE <br />JIFF SEWAGE CAN BE PUT INTO THE CITY FLOW SYSTEM; PLANS TO BE DE- <br />LIVERED WITHIN THREE WEEKS OF SIGNING OF THE CONTRACT. <br />ADMINISTRATOR JENNINGS REPORTED TO THE BOARD ON THE PROGRESS <br />MADE ON THE FLOOD INSURANCE CONTOUR SURVEY. HE NOTED THAT WE -HAVE A <br />JUNE DEADLINE, AND IF WE DO NOT GET THE INFORMATION IN BEFORE THIS <br />DEADLINE, HUD WILL ESTABLISH THE LINES AS PRESENTLY SET OUT ON THE RATE <br />MAPS, WHICH ARE NOT SATISFACTORY TO US. THE ADMINISTRATOR CONTINUED <br />THAT ON MARCH 22ND THE BOARD AUTHORIZED HIM TO HAVE SURVEYS AND AERIAL <br />PHOTOS MADE OF THE SOUTH BEACH AREA NOT TO EXCEED AN AMOUNT OF $5,000.00. <br />SINCE THEN KUCERA & ASSOCIATES HAVE REVIEWED THEIR PREVIOUS ESTIMATE <br />AND HAVE COME UP WITH A FIGURE OF $12,000 FOR SUCH A FLIGHT. THE <br />ADMINISTRATOR CONTINUED THAT BECAUSE OF THIS, HE DECIDED TO TRY TO <br />LOCATE MYLARS OF THE OLD AERIALS. PROPERTY APPRAISER LAW DID NOT WISH <br />TO HAVE THE CONTOUR LINES ADDED TO HIS AERIALS AS HE FELT IT MIGHT BE <br />b <br />DETRIMENTAL. TO FUTURE REFERENCE, BUT THE ADMINISTRATOR STATED THAT HE <br />FORTUNATELY WAS ABLE TO LOCATE MYLARS OF THIS PARTICULAR AREA IN HIS <br />OWN FILES, BASED ON THESE MYLARS, HE WORKED WITH SURVEYOR MUSICK, AND <br />_ THEY NOW HAVE PREPARED A SET OF MYLARS ON WHICH THEY HAVE PLACED THE <br />CONTOUR LINES BETWEEN S.R. AIA AND THE OCEAN FROM THE SOUTH CITY LIMITS <br />TO THE SOUTH COUNTY LINE. THESE LINES ARE TIED INTO GOVERNMENT BENCH <br />MARKS, AND WE NOW HAVE A REGISTERED SURVEY WITHOUT HAVING TO DO ANY <br />FLYING. <br />ADMINISTRATOR .JENNINGS STATED THAT HE WOULD LIKE TO HAVE A <br />BOARD MEMBER TAKE THE MYLARS TO ATLANTA WITH A WRITTEN REQUEST THAT <br />THIS AREA BE RE-EVALUATED AND OUR ELEVATIONS ACCEPTED AS A CONTROL FOR <br />THE FLOOD INSURANCE RATHER THAN THE MAPS SENT TO US BY HUD. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY AUTHORIZED THE CHAIRMAN TO WRITE A LETTER <br />TO HUD EXPLAINING THE BOARDS POSITION IN REGARD TO THE FLOOD INSURANCE <br />RATE MAPS AND AUTHORIZED A COMMISSIONER AND THE ADMINISTRATOR TO HAND <br />CARRY THE INFORMATION To ATLANTA, IF NECESSARY. <br />e - <br />29 <br />BO(( <br />1979 3 m4 <br />App �: - . - . <br />