My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/19/1978
CBCC
>
Meetings
>
1970's
>
1978
>
4/19/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:07 AM
Creation date
6/11/2015 10:12:00 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Board of Supervisors
Document Type
Minutes
Meeting Date
04/19/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N • <br />n a <br />•• 1 <br />IORM 722-29 J •� <br />j 7-77 <br />►AOtfOlf , <br />is .. .. <br />8. The COMPANY has determined that the method to be used in developing the relocation <br />or adjustment cost shall be as specified for the method checked and described hereafter: <br />.. (a) Actual and related indirect costs accumulated in accordance with a work order <br />accounting procedure prescribed by the applicable Federal or State regulatory body. . <br />(b) Actual and related indirect costs accumulated in accordance with an established <br />accounting procedure developed by the COMPANY and approved by the <br />f DEPARTMENT. <br />(e) An agreed lump sum S , as supported by a detail analysis of <br />estimated cost attached hereto. (Note: This method is not applicable where the <br />estimated cost of the proposed adjustment exceeds $10,000.) <br />f� <br />i <br />• 9. The installation and/or adjustment of the COMPANY'S facility as planned Odlkwill not) <br />involve additional work over and above the minimum reimbursable requirements of the <br />DEPARTDIENT. (If upgrading and/or nonreimbursable work is involved at the option of the <br />COMPANY, then credit against the cost of the project is required and will be governed by the method <br />checked and described hereafter): <br />(a) % will be applied to the final billing of work actually accomplished to <br />determine required credit for (betterment) agd/or (expired service life) and/or <br />(nonreimbursable segments). <br />(b) All work involving nonreimbursable segments will be performed by special <br />COMPANY work or job order number apart and separate from the reimbursable <br />portion of the work; such work or job order number to be <br />The COMPANY further agrees to clearly identify such additional work areas in the <br />COMPANY'S plans and estimates for the total work covered by this Agreement. <br />(c) $ credited for (betterment) and/or (expired service life) <br />and/or (nonreimbursable segments) in accord with Article 8.(c) herein above. <br />10. It is specifically agreed by and between the DEPARTMENT and the COMPANY that the <br />DEPARTMENT shall receive fair and adequate credit for any salvage which shall accrue to the COMPANY <br />as a result of the above installation and/or adjustment work. <br />11. It is further agreed that the cost of all installations and/or adjustments made during this <br />installation work shall be boine by the COMPANY, subject only to the DEPARTMENT bearing such <br />portion of this cost as represents the cost of installation and/or adjustment of the previously existing <br />facility, less salvage credit as set forth in the immediately preceeding paragraph. <br />J . <br />J <br />,. . -. .. :. .. .. _,..... +�•. �..}... .. Y ....... � .� .' ,. .9....'7.1'. ... .'. �1 .9 <br />APR 191978 BOOK 34 Pw 290 <br />
The URL can be used to link to this page
Your browser does not support the video tag.