My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/16/1978
CBCC
>
Meetings
>
1970's
>
1978
>
6/16/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:07 AM
Creation date
6/11/2015 10:18:21 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
06/16/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DISCUSSION FOLLOWED ON THE PRICE OF NEW METERS, WHICH MR. <br />ENG STATED -RUN AROUND $35.00 APIECE. <br />ENGINEER BEINDORF POINTED OUT THAT YOU REALLY CANT BE TOO <br />CRITICAL OF INDIVIDUAL ITEMS ON A BID BECAUSE THE BIDDERS WILL BUMP <br />THE PRICE UP IN SOME PLACES AND THEN DROP IT IN OTHER PLACES. AS AN <br />EXAMPLE, HE NOTED THAT ON FLUSHING THE SYSTEM, ONE FIRM BID $2,500 <br />WHILE THE OTHER BID $10,000. <br />CHAIRMAN VIODTKE DISCUSSED THE WATER ALLOCATION FOR THE AREA, <br />AND ENGINEER BEINDORF STATED THAT, BASED ON THE CONSUMPTION INDICATED <br />IN THE REPORT, IT WOULD TAKE CARE OF APPROXIMATELY 1,200 UNITS. <br />CHAIRMAN WODTKE ASKED IF THE ENGINEERS HAVE HAD ANY EXPERI- <br />ENCE WITH DRIVEWAYS, INC., OR DONE ANY CHECKING ON THE BACKGROUND OF <br />THE COMPANY, AND THEY STATED THAT THEY HAVE NOT. HE THEN INQUIRED <br />ABOUT THE TOTAL DIFFERENCE IN THE BIDS AND WAS INFORMED THAT IT AMOUNTS <br />TO APPROXIMATELY $13,000. <br />ENGINEER .JONES STATED THAT THEY CAN EASILY CHECK ON DRIVEWAYS, <br />INC., JUST BY MAKING A FEW PHONE CALLS TO COMMUNITIES WHERE THEY HAVE <br />WORKED, <br />CHAIRMAN WODTKE NOTED THAT TIME IS OF THE ESSENCE AND IN- <br />QUIRED ABOUT THE TIME PERIOD IN THEIR BID. <br />MR. ENG STATED THAT THEY GAVE THEM 75 DAYS TO COMPLETE THEIR <br />WORK. HE CONTINUED THAT THE CONTRACT CAN BE AWARDED AS SOON AS THE <br />PURCHASE OF U.D.U. IS COMPLETE, AND THEY COULD HAVE A PRE - <br />CONSTRUCTION CONFERENCE PROBABLY WITHIN A WEEK, AND THE COMPANY COULD <br />START WORK A WEEK AFTER THAT, <br />THE CHAIRMAN POINTED OUT THAT THIS WOULD TAKE US UP INTO <br />SEPTEMBER, AND MR. ENG STATED THAT THE 75 DAYS IS TO COMPLETE ALL THE <br />WORK, AND AS SOON AS THE SYSTEM IS FLUSHED, THEY COULD GO AHEAD AND <br />TIE IN.THE SCHOOLS BEFORE ANYTHING ELSE. <br />MR. ENG COMMENTED THAT WITH.A $13,000 DIFFERENCE, HE DID NOT <br />FEEL WE COULD ACCEPT THE HIGHER BID UNLESS SOMETHING IS DRASTICALLY <br />WRONG WITH DRIVEWAYS, INC. THE BOARD AGREED. <br />ON MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY ACCEPTED THE BID OF DRIVEWAYS, INC., ON <br />7 <br />I <br />BOOK 35 PAb .104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.