My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/21/1978
CBCC
>
Meetings
>
1970's
>
1978
>
6/21/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2019 9:47:34 AM
Creation date
6/11/2015 10:19:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/21/1978
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.2 <br />Adjustments: Test Well <br />2.21 <br />For drilling and formation sampling <br />" <br />more or less than 125 feet <br />AS BID <br />$ <br />6.00/Ft. <br />2.22 <br />For setting more or less than 20 <br />' <br />feet of screen interval (insertion <br />of a blank section is to be consid- <br />ered part of screen) <br />' <br />SUGGESTED - NEGOTIATION TO PRICE OF <br />$ <br />40.00/Ft. <br />Xn making their bid, 21cCullers and <br />Howard assumed that stainless steel <br />well screen would be installed. <br />However, iron screen was called for <br />' <br />in the specifications. Iron screen <br />costs about half- as much as stainless <br />• <br />steel screen (less shipping costs). <br />2.23 <br />For development more or less than 20 <br />hours <br />AS BID <br />$ <br />15.00/Hr. <br />2.24 <br />For testing more or less than 24 hours <br />AS BID <br />$ <br />15.00/Hr. <br />2.25 <br />For standby time for work delays <br />imposed by the Owner or Consultant <br />AS BID <br />$ <br />40.00/Hr. <br />3.0 <br />OBSERVATION WELLS <br />3.1 <br />For providing equipment, materials, <br />and labor necessary to construct, <br />sample, develop, test, and remove <br />three observation wells and three <br />dry wells in accordance with the <br />specifications <br />AS BID LUMP SUM PRICE OF <br />$ <br />2,320.00 <br />3.2 <br />Adjustments: Observation Wells <br />3.21- <br />For drilling and formation sampling <br />more or less than 125 feet deep <br />As IIID <br />$ <br />2.00/Ft. <br />3.22 <br />For observation well casing left in <br />place <br />AS IIID <br />$ <br />1.70/rt. <br />3.23 <br />For observation well screens left ,in <br />Place <br />rr <br />5 <br />� <br />JUN 2x.1979' <br />;;i)cG].STI(1N---NI,G6TTA-P .ON TO i1111 -Cl: <br />
The URL can be used to link to this page
Your browser does not support the video tag.