CONTINUED THAT HE WROTE THE CITY IN MARCH ASKING THAT THEY WAIVE <br />THE OFF—HOURS REQUIREMENT AND CONSIDER THE $187,50 PER UNIT AS <br />THE FEE FOR THE USAGE OF THE PUMPING STATIONS AND THE FORCE MAINS, <br />HE NOTED THAT THE COUNTY HAS AN ALLOCATION TO USE A CERTAIN <br />CAPACITY OF THE SEWER PLANT THE -CITY HAD RECEIVED A GRANT FOR SO IT <br />APPEARED THE STORAGE REQUIREMENT THE CITY WANTED TO PUT ON THE <br />SYSTEM SHOULD BE WAIVED, MR. BEINDORF STATED THAT THE CITY THEN <br />WANTED TO SEE WHAT IMPACT THE GIFFORD SEWAGE WOULD HAVE ON THEIR <br />EXISTING SYSTEM, AND LLOYD & ASSOCIATES NOW HAVE INDICATED THAT TWO <br />LIFT STATIONS WOULD BE AFFECTED — LIFT STATION 2 AND LIFT STATION9 — <br />AND HAS ESTIMATED A COST OF $27,000 TO REBUILD OR REPLACE THE MOTORS <br />OF THESE TWO LIFT STATIONS. <br />MR. BEINDORF CONTINUED THAT, BASED ON THAT FIGURE AND WHERE <br />WE COULD TIE ON, THE ENGINEERS RE—EVALUATED COSTS AND CAME UP WITH <br />A FIGURE OF $229,712 FOR TYING INTO THE CITY FLOW SYSTEM, OR ABOUT <br />$19,000 OVER WHAT WAS ORIGINALLY PROPOSED LAST OCTOBER, HE NOTED THAT <br />$210,000 HAD BEEN ALLOCATED TO PUMP FROM GIFFORD DIRECTLY TO THE <br />CITY TREATMENT PLANT, BUT POINTED OUT THAT THE COUNTY WOULD HAVE TO <br />i <br />MAINTAIN THE LINE ALL THIS WAY, APPROXIMATELY SIX MILES, WHICH COULD <br />i <br />BE A REAL PROBLEM. ENGINEER BEINDORF STATED THAT THIS REPORT IS <br />BASED ON A PEAK FLOW OF 500,000 G.P.D. BECAUSE YOU MUST ALLOW FOR <br />EXPANSION AND FUTURE FLOW, AND THE ESTIMATION IS FIGURED ON THE MAXIMUM <br />COST, ASSUMING THAT THE $187,50 PER UNIT FEE DID NOT COVER REBUILDING <br />OF THE PUMPING STATIONS. <br />COMMISSIONER SIEBERT FELT THE $187.50 IS ESSENTIALLY c <br />AN -IMPACT FEE. HE NOTED THE ONLY THING WE ARE DOING IS NOT BRINGING <br />A LINE TO THE CITY'S PLANT — WE ARE PAYING A FEE FOR THEM TO EXPAND <br />THEIR DISTRIBUTION LINE IN THE FUTURE. <br />CHAIRMAN WODTKE DISCUSSED WHAT IS INVOLVED IN HOOKING UP TO <br />A HOME AND NOTED THERE IS A GREAT DEAL OF DIFFERENCE BETWEEN THE <br />WAY THE WATER IS GOING TO OPERATE AND THE SEWER IS GOING TO OPERATE. <br />ENGINEER BEINDORF NOTED THAT THE SEWER CONNECTION CHARGE <br />WOULD HAVE TO BE SET AT A FUTURE DATE, AND COMMISSIONER SIEBERT STATED <br />THE ORDINANCE PROVIDES FOR THIS, <br />juii 2 1 197 85 <br />BOOK 35 PAGr ��� <br />