Laserfiche WebLink
BUILT IN CONJUNCTION WITH THE CETA GRANT AND THAT THE MONEY IS <br />THERE TO FINISH THE PROJECT, HE WOULD LIKE TO SEE US PARTICIPATE <br />AS REQUESTED. <br />MOTION WAS MADE BY COMMISSIONER SIEBERT, SECONDED BY <br />COMMISSIONER Loy, TO AUTHORIZE THE ADMINISTRATOR TO ASSIST IN THE <br />PREPARATION OF;THE TENNIS COURTS AT THE GIFFORD PARK AS SET OUT IN <br />THE LETTER FROM J. RALPH LUNDY, BASED UPON THE ASSURANCE OF THE <br />GIFFORD PROGRESSIVE CIVIC LEAGUE THAT THE MONIES ARE THERE TO FINISH <br />THE PROJECT, <br />COMMISSIONER Loy SUGGESTED THAT WE REQUEST THE GIFFORD <br />PROGRESSIVE CIVIC LEAGUE TO WORK VERY CLOSELY WITH MR. REGAN, DIRECTOR <br />OF THE COMMUNITY DEVELOPMENT PROGRAM,TO BENEFIT FROM THE EXPERTISE <br />HE HAS GAINED FROM WORKING ON TENNIS COURTS AT THE WABASSO PARK. <br />ADMINISTRATOR .JENNINGS SAID, AS HE UNDERSTANDS IT, THE COUNTY <br />.WILL CLEAR THE LAND, PUT IN THE BASE MATERIAL AND MARL, SET GRADES, <br />AND IF THE LIMEROCK IS SUPPLIED, COULD SPREAD IT AND GET IT READY FOR <br />THE ACTUAL FINISH, BUT THE PLACING OF FENCE POSTS, ETC., AND ACTUAL <br />FINISHING OF THE ASPHALT WILL BE DONE BY OTHERS. THE BOARD AGREED. <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />ENGINEER .JAMES BEINDORF CAME -BEFORE THE BOARD TO DISCUSS <br />THE REVISED CONTRACT WITH THE COUNTY CONSULTING ENGINEERS (SVERDRUP <br />& PARCELS AND ASSOCIATES, INC., AND BEINDORF AND ASSOCIATES, INC., <br />A .JOINT VENTURE.) HE STATED THAT HE AND ATTORNEY COLLINS HAVE <br />COORDINATED WITH FHA AND FEEL THAT THE BEST WAY TO DO THIS WOULD <br />BE TO MODIFY ONLY SECTION E OF THE AGREEMENT BETWEEN THE COUNTY <br />AND THE JOINT VENTURE BECAUSE THE SCOPE OF THE WORK ACTUALLY REMAINS <br />.THE SAME. HE STATED THAT WHAT THEY ARE SUGGESTING WOULD BE CALLED <br />MODIFICATION #3. MODIFICATION #1 AND #2, SIGNED ON OCTOBER 5, 1977, <br />REVISED THE ORIGINAL 1972 CONTRACT TO INCLUDE THE ENGINEERING FOR <br />THE ELEVATED STORAGE TANK, ETC., AND THE RENOVATION OF THE'WATER <br />SYSTEM FOR THE GIFFORD AREA. MODIFICATION #3 WOULD ONLY BE CHANGING <br />THE HOURLY RATES IN THE OLD CONTRACT TO MAKE THEM CURRENT WITH TODAY�S <br />JUL. 0 51978 <br />18 <br />