My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/5/1978
CBCC
>
Meetings
>
1970's
>
1978
>
7/5/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:07 AM
Creation date
6/11/2015 10:20:30 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/05/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
82
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BUILT IN CONJUNCTION WITH THE CETA GRANT AND THAT THE MONEY IS <br />THERE TO FINISH THE PROJECT, HE WOULD LIKE TO SEE US PARTICIPATE <br />AS REQUESTED. <br />MOTION WAS MADE BY COMMISSIONER SIEBERT, SECONDED BY <br />COMMISSIONER Loy, TO AUTHORIZE THE ADMINISTRATOR TO ASSIST IN THE <br />PREPARATION OF;THE TENNIS COURTS AT THE GIFFORD PARK AS SET OUT IN <br />THE LETTER FROM J. RALPH LUNDY, BASED UPON THE ASSURANCE OF THE <br />GIFFORD PROGRESSIVE CIVIC LEAGUE THAT THE MONIES ARE THERE TO FINISH <br />THE PROJECT, <br />COMMISSIONER Loy SUGGESTED THAT WE REQUEST THE GIFFORD <br />PROGRESSIVE CIVIC LEAGUE TO WORK VERY CLOSELY WITH MR. REGAN, DIRECTOR <br />OF THE COMMUNITY DEVELOPMENT PROGRAM,TO BENEFIT FROM THE EXPERTISE <br />HE HAS GAINED FROM WORKING ON TENNIS COURTS AT THE WABASSO PARK. <br />ADMINISTRATOR .JENNINGS SAID, AS HE UNDERSTANDS IT, THE COUNTY <br />.WILL CLEAR THE LAND, PUT IN THE BASE MATERIAL AND MARL, SET GRADES, <br />AND IF THE LIMEROCK IS SUPPLIED, COULD SPREAD IT AND GET IT READY FOR <br />THE ACTUAL FINISH, BUT THE PLACING OF FENCE POSTS, ETC., AND ACTUAL <br />FINISHING OF THE ASPHALT WILL BE DONE BY OTHERS. THE BOARD AGREED. <br />THE CHAIRMAN CALLED FOR THE QUESTION. IT WAS VOTED ON AND <br />CARRIED UNANIMOUSLY. <br />ENGINEER .JAMES BEINDORF CAME -BEFORE THE BOARD TO DISCUSS <br />THE REVISED CONTRACT WITH THE COUNTY CONSULTING ENGINEERS (SVERDRUP <br />& PARCELS AND ASSOCIATES, INC., AND BEINDORF AND ASSOCIATES, INC., <br />A .JOINT VENTURE.) HE STATED THAT HE AND ATTORNEY COLLINS HAVE <br />COORDINATED WITH FHA AND FEEL THAT THE BEST WAY TO DO THIS WOULD <br />BE TO MODIFY ONLY SECTION E OF THE AGREEMENT BETWEEN THE COUNTY <br />AND THE JOINT VENTURE BECAUSE THE SCOPE OF THE WORK ACTUALLY REMAINS <br />.THE SAME. HE STATED THAT WHAT THEY ARE SUGGESTING WOULD BE CALLED <br />MODIFICATION #3. MODIFICATION #1 AND #2, SIGNED ON OCTOBER 5, 1977, <br />REVISED THE ORIGINAL 1972 CONTRACT TO INCLUDE THE ENGINEERING FOR <br />THE ELEVATED STORAGE TANK, ETC., AND THE RENOVATION OF THE'WATER <br />SYSTEM FOR THE GIFFORD AREA. MODIFICATION #3 WOULD ONLY BE CHANGING <br />THE HOURLY RATES IN THE OLD CONTRACT TO MAKE THEM CURRENT WITH TODAY�S <br />JUL. 0 51978 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.