Laserfiche WebLink
2.0 <br />TEST WELL <br />2.1 <br />For providing equipment, materials, and <br />labor necessary to construct, sample, develop, <br />_ <br />test, and remove one test well in accordance <br />with the specifications <br />$12,130.00 <br />2.2 <br />Adjustments: Test Well <br />2.21 <br />For drilling and formation sampling more <br />or less than 125 feet <br />$ <br />6.00/Ft. <br />2.22 <br />For setting more or less than 20 feet of <br />screen interval (insertion of a blank section <br />is to be considered part of screen) <br />$ <br />40.00/Ft.. <br />2.23 <br />For development more or less than 20 <br />hours • <br />$ <br />15.00/Hr. <br />2.24 <br />For testing more or less than 24 hours <br />$ <br />15.00/Hr. <br />2.25 <br />For standby time for work delays imposed <br />by the Owner or Consultant <br />$ <br />40.00/Hr. <br />3.0 <br />OBSERVATION WELLS <br />3.1 <br />For providing equipment, materials, and <br />labor necessary to construct, sample, develop <br />test, and remove three observation wells <br />° <br />and three dry wells in accordance with the <br />specifications <br />$ <br />2,320.00 <br />a <br />-3.2 <br />Adjustments: Observation Wells <br />' <br />3.21 <br />For drilling and formation sampling more <br />or less than 125 feet deep <br />.$ <br />2-.00/Ft. <br />3.22 <br />For observation well casing left in <br />place <br />$ <br />1.70/Ft. <br />3.23 <br />For observation well screens left in place <br />$ <br />80.00/Screen <br />3.24 <br />For standby time for work delays imposed <br />. <br />by the Owner or Consultant <br />$ <br />40.00/Hr. <br />-2- <br />4 <br />mut 35 A69, <br />JUL 1.91978 <br />