My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/9/1978
CBCC
>
Meetings
>
1970's
>
1978
>
8/9/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:08 AM
Creation date
6/11/2015 10:29:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/09/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 <br />THE BOARD NEXT DISCUSSED RELEASE OF EASEMENT BETWEEN LOTS 4 <br />AND 5, BLOCK C, GRANADA SUBDIVISION, UNIT #1, AS REQUESTED BY <br />MR. AND MRS. LIGE BRAGG. MRS, BARBATO APPEARED IN THEIR BEHALF. SHE <br />STATED THAT THEY WISH TO PUT A BUILDING ON LOTS 4 AND 5 AND IN ORDER <br />TO DO THIS, THE 2.5' EASEMENTS ON THE SIDE LOT LINES WOULD HAVE TO BE <br />REMOVED. SHE STATED THAT THIS AREA, WHICH IS IN THE VICINITY OF <br />VERO HIGHLANDS AND VERO SHORES, IS ZONED COMMERCIAL. <br />ADMINISTRATOR JENNINGS INFORMED THE BOARD THAT THIS IS A <br />STANDARD REQUEST FOR A RELEASE OF EASEMENT AND HE SEES NO PROBLEM <br />WITH IT. <br />ON MOTION BY COMMISSIONER SCHMUCKER, SECONDED BY COMMISSIONER <br />DEESON, THE BOARD UNANIMOUSLY ADOPTED A RESOLUTION APPROVING RELEASE <br />` OF EASEMENTS BETWEEN LOTS 4 AND 5, BLOCK C, GRANADA GARDENS SUBDIVISION, <br />UNIT #1, AS REQUESTED BY MR. AND MRS. LIGE BRAGG, AND AUTHORIZED THE <br />CHAIRMAN'S SIGNATURE; THESE DOCUMENTS TO BE PREPARED AT THE EXPENSE OF� <br />4 <br />THE APPLICANT. <br />INTERGOVERNMENTAL COORDINATOR THOMAS REPORTED THAT THE WEST <br />CAUSEWAY BRIDGE AT 111ABASSO HAS FILLED UNDER WITH.SILT AND SAND, CAUSING <br />A STAGNATION OF WATER, ORDORS, ETC. HE NOTED THAT THE BRIDGE WAS PUT <br />THERE AT THE REQUEST OF THE DER IN ORDER TO AVOID THIS, BUT NOW TO DO <br />SOMETHING TO CORRECT THIS SITUATION, IT IS NECESSARY TO GO THROUGH ALL <br />THE.PERMITTING. HE INFORMED THE BOARD THAT HE NEEDS PERMISSION TO APPLY <br />FOR A PERMIT TO CLEAN THIS OUT. HE FELT THE COUNTY HAS THE EQUIPMENT <br />TO DO THIS THEMSELVES, <br />ON'MOTION BY COMMISSIONER SIEBERT, SECONDED BY COMMISSIONER <br />Loy, THE BOARD UNANIMOUSLY AUTHORIZED THE INTERGOVERNMENTAL COORDINATOR <br />TO'APPLY FOR A DREDGING PERMIT AS DISCUSSED. <br />COORDINATOR THOMAS THEN INFORMED THE BOARD THAT IN ORDER TO <br />DREDGE, YOU ARE NOW REQUIRED BY STATUTE TO USE A TURBIDITY CURTAIN, WHICH <br />IS STYROFOAM ON TOP WITH A NYLON MESH. HE STATED THAT_IT IS MANUFACTURED <br />IN COCOA AND IS AVAILABLE IN 50'. SECTIONS AT A PRICE OF APPROXIMATELY <br />$6.00 PER FOOT. HE FELT A MAXIMUM OF 200' WOULD BE NEEDED. HE <br />CONTINUED THAT HE HAD CONTACTED•MR. BEIDLER OF MOSQUITO CONTROL, WHO <br />ALSO WOULD HAVE A USE FOR THIS AND HE HAS AGREED TO BUY HALF OF IT. <br />THE COUNTY WOULD OWN HALF, OR 100', AND THE MOSQUITO CONTROL DISTRICT <br />y . <br />BOOK %)u FAIIIII: <br />AUG 09197 r <br />
The URL can be used to link to this page
Your browser does not support the video tag.