Laserfiche WebLink
<br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK OF THE BOARD <br />11.J. UTILITIES SERVICES <br />11.J.1. HIPMPWM <br />OBART NDUSTRIAL ARK ASTER LANNED ATER AIN <br />A77SWUSH1,AP <br />TH <br />LONG TREET EST OF IGHWAY PPROVED ROJECT <br />PBRW.F.MCA, <br />FOR UBLIC ID AND ETAINING CAIN AND SSOCIATES <br />I.ES <br />NC FOR NGINEERING ERVICES <br /> <br />ON MOTION by Commissioner Lowther, SECONDED by <br />Commissioner Davis, the Board unanimously approved the project <br />for a total cost of $315,000.00 (rounded); approved the proposal <br />for construction phase engineering services from W. F. McCain <br />and Associates for $11,365.00, and authorized the Chairman to <br />execute same, as recommended in the memorandum of September <br />26, 2006. <br /> <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK OF THE BOARD <br />11.J.2.CSWON.3 <br /> ONSULTING ERVICES ORK RDER O WITH <br />N-S,I.S,E <br />EELCHAFFER NC FOR URVEYING NGINEERING AND <br />CSR <br />ONSTRUCTION ERVICES FOR THE EPLACEMENT OF THE <br />RWT–UCP-2478 <br />OSELAND ATER ANK <br /> <br />ON MOTION by Commissioner Wheeler, SECONDED by <br />Commissioner Davis, the Board unanimously approved Work <br />Order No. 3 with Neel-Schaffer, Inc. in the amount of <br />not-to-exceed $105,138.00 for survey, geotechnical, design, <br />permitting and construction services to replace the Roseland <br />October 24, 2006 <br />61 <br /> <br /> <br />