My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/2006
CBCC
>
Meetings
>
2000's
>
2006
>
10/03/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 1:08:49 PM
Creation date
10/1/2015 6:09:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Implementation
Meeting Date
10/03/2006
Supplemental fields
SmeadsoftID
2133
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. CR 512 Phase III, CR 510 - Project #9611 & 0001, Bid Number <br /> <br />2006065, Change Order #5 <br /> <br />(memorandum dated September 25, 2006) 551-554 <br /> Approved Change Order # 5 increasing the contract amount by <br />$125,931.97 for CR 512 Phase III, CR 510 - Project #9611 & <br /> <br />0001, Bid Number 2006065 and authorized the Chairman to sign. <br /> <br />6. Amendment No. 1 to the Professional Civil Engineering Services <br /> <br />Agreement for Civil Engineering and Bridge Design Services with <br /> <br />Bridge Design Associates, Inc. RFQ 7058 <br />(memorandum dated September 12, 2006) 555-560 <br /> Approved Amendment No. 1 in the amount of $23,056.40 to the <br />Professional Civil Engineering Services Agreement for Civil <br />Engineering and Bridge Design Services with Bridge Design <br /> <br />Associates, Inc. RFQ 7058 and authorized the Chairman to sign. <br /> <br />7. Addendum No. 2 Work Order No. 6 (Engineering/Survey) Kings <br /> <br />st <br />Highway Extension, South, Phase 1. Oslo Road through 21 St. <br /> <br />SW, Topographic/Design Survey <br />th <br />(memorandum dated September 20, 2006) 561-565 <br /> Approved Addendum No. 2 Work Order No. 6 <br />(Engineering/Survey) for a lump sum fee of $33,885.00 for the <br />Kings Highway Extension, South, Phase 1. Oslo Road through <br /> <br />st <br />21 St. SW, Topographic/Design Survey and authorized the <br />Chairman to execute the same. <br /> <br />8. Amendment No. 3 to the Civil Engineering and Land Surveying <br /> <br />th <br />Agreement for Intersection Improvements at 58 Avenue and SR 60 <br /> <br />Thoroughfare Network Analysis and Traffic Modeling Study <br />(memorandum dated September 25, 2006) 566-573 <br /> Approved Amendment No. 3 for the total lump sum fee of <br />$37,200.00 to the Civil Engineering and Land Surveying <br />th <br />Agreement for Intersection Improvements at 58 Avenue and SR <br />60 Thoroughfare Network Analysis and Traffic Modeling Study <br /> <br />and authorized the Chairman to execute the same. New contract <br />amount is $561.340.00. <br /> <br /> <br /> <br /> <br /> <br /> <br />11. <br />DEPARTMENTAL MATTERS (CONT’D.) PAGE <br /> Public Works (Cont’d.) <br />I. <br /> <br />Page 16 of 18 <br />October 3, 2006 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.