Laserfiche WebLink
<br />Commissioner Davis asked if this would also mean fixing the traffic lights in front of Sebastian <br />River High School. He wanted an estimate of the time in getting this done. <br /> <br />Public Works Director Jim Davis explained that this has to do with some conduits and the project <br />would provide inter-connect conduits for the traffic signals so they all work in coordination. It would be <br />about a year from now before the project is complete and all the signals are in, he said. <br /> <br />Commissioner Bowden asked whether about Indian River Boulevard was completed. She <br />agreed that staff could take some time to look into it and get back to her. <br /> <br />Commissioner Davis stated that the traffic situation as it is right now is slowing things down, and <br />if staff could get the lights working as soon as possible he would appreciate it. <br /> <br />ON MOTION by Commissioner Lowther, SECONDED by <br />Commissioner Davis, the Board by a 4-0 vote (Commissioner <br />Wheeler absent) approved Change Order No. 5 increasing the <br />contract amount by $125,931.97 with funding from account <br />specified, as recommended in the memorandum of September 25, <br />2006. The new contract amount will now be $13,748,262.60. <br /> <br /> <br /> <br /> <br /> <br />11.I.6. Amendment No. 1 to the Professional Civil Engineering Services <br />Agreement for Civil Engineering and Bridge Design Services with <br />Bridge Design Associates, Inc. RFQ 7058 <br /> <br />October 3, 2006 <br />63 <br /> <br />