My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/03/2006 (2)
CBCC
>
Meetings
>
2000's
>
2006
>
10/03/2006 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/20/2022 1:12:15 PM
Creation date
10/1/2015 6:11:28 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
10/03/2006
Meeting Body
Board of County Commissioners
Archived Roll/Disk#
3125
Book and Page
131, 470-561
Supplemental fields
SmeadsoftID
3021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Commissioner Davis asked if this would also mean fixing the traffic lights in front of Sebastian <br />River High School. He wanted an estimate of the time in getting this done. <br /> <br />Public Works Director Jim Davis explained that this has to do with some conduits and the project <br />would provide inter-connect conduits for the traffic signals so they all work in coordination. It would be <br />about a year from now before the project is complete and all the signals are in, he said. <br /> <br />Commissioner Bowden asked whether about Indian River Boulevard was completed. She <br />agreed that staff could take some time to look into it and get back to her. <br /> <br />Commissioner Davis stated that the traffic situation as it is right now is slowing things down, and <br />if staff could get the lights working as soon as possible he would appreciate it. <br /> <br />ON MOTION by Commissioner Lowther, SECONDED by <br />Commissioner Davis, the Board by a 4-0 vote (Commissioner <br />Wheeler absent) approved Change Order No. 5 increasing the <br />contract amount by $125,931.97 with funding from account <br />specified, as recommended in the memorandum of September 25, <br />2006. The new contract amount will now be $13,748,262.60. <br /> <br /> <br /> <br /> <br /> <br />11.I.6. Amendment No. 1 to the Professional Civil Engineering Services <br />Agreement for Civil Engineering and Bridge Design Services with <br />Bridge Design Associates, Inc. RFQ 7058 <br /> <br />October 3, 2006 <br />63 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.