My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2009
CBCC
>
Meetings
>
2000's
>
2009
>
10/06/2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/14/2020 12:07:20 PM
Creation date
10/1/2015 6:16:33 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda
Meeting Date
10/06/2009
Meeting Body
Board of County Commissioners
Supplemental fields
SmeadsoftID
7066
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8. CONSENT AGENDA PAGE <br />I. Bridge Design Associates, Inc. Work Order No. 4 for Bridge Construction <br />Phase 56th Place Bridge over I.R.F.W.C.D. North Relief Canal (IRC Project <br />No. 0611-B) Release of Retainage <br />(memorandum dated September 25, 2009) 43-44 <br />J. Bridge Design Associates, Inc. Work Order No. 6 for Bridge Construction <br />Phase Services for 16th Street Bridge over I.R.F.W.C.D. Range Line Canal <br />(at 74th Avenue) (IRC Project No. 9920-B) Release of Retainage <br />(memorandum dated September 25, 2009) <br />45-46 <br />K. Approval of Professional Surveying and Mapping/GIS Service Agreements <br />for Annual Surveying and Mapping/GIS Contract, 2009-2010 <br />(memorandum dated September 22, 2009) <br />47-79 <br />L. Supervisor of Elections 2008/2009 Budget Amendment <br />(memorandum dated September 29, 2009) 80-83 <br />M. Oslo Road Between 27th Avenue and Old Dixie Highway, FPL Agreement to <br />Install Street Lights <br />(memorandum dated September 28, 2009) <br />84-97 <br />N. Work Order No. 4 (Sidewalk/Sod) — H & D Construction Co, Inc. Ashley <br />Lakes Subdivision <br />(memorandum dated September 24, 2009) <br />98-107 <br />O. Work Order No. 3 (Sidewalk/Sod) — H & D Construction Co, Inc., Oaks of <br />Vero Subdivision Phase 2 <br />(memorandum dated September 14, 2009) <br />108-116 <br />P. Final Pay to Schulke, Bittle & Stoddard for Continuing Consulting Services <br />for Work Order No. 8 for Engineering Design, Surveying and Construction <br />Administration Services for SR 60 Phase 3 Improvements, Bid No. 2009027 <br />— UCP #3098 <br />(memorandum dated September 18, 2009) <br />Q. <br />117-119 <br />Approval of Bid Award for IRC Bid No. 2010008 Mowing at Three (3) <br />Water Treatment Plants Utilities Department / Water Treatment Division <br />(memorandum dated September 29, 2009) <br />120-126 <br />R. Approval of Bid Award for IRC Bid No. 2010012 Annual Bid for Traffic <br />Signal Hardware and Wire <br />(memorandum dated September 29, 2009) <br />127-133 <br />S. Declare Excess Equipment Surplus for Sale or Disposal <br />(memorandum dated September 29, 2009) 134-139 <br />October 6, 2009 Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.