Laserfiche WebLink
approved by the Board, all as recommended in the <br />memorandum of January 4, 2006. <br /> <br />R.J. Martin, , <br />859 Island Club Square, Wabasso BeachOrchid Island, reported that <br />according to Turner Construction’s schedule for the Administration Complex, Building 2 is <br />supposed to be having stairs and its roof installed at this time. This schedule was made available to <br />him in August and he has been keeping track of it. The bridge to Aviation Blvd. should have been <br />finished the first of June 2005. <br /> <br />11.I.1. PUBLIC WORKS – A.M. ENGINEERING AND TESTING, INC. <br />– WORK ORDER NO. 1 (ENGINEERING) - PROFESSIONAL <br />ST <br />GEOTECHNICAL SERVICES CONTRACT NO. 0534 FOR 41 <br />STREET ROADWAY IMPROVEMENTS – PROJECT NOS. <br />0016 AND 0236 <br /> <br />ON MOTION by Commissioner Davis, SECONDED by <br />Commissioner Wheeler, the Board unanimously approved <br />Work Order No. 1 (Engineering) with A.M. Engineering <br />and Testing, Inc., for a not-to-exceed fee of $37,700.00 <br />authorizing the above-mentioned project as outlined in the <br />proposed scope of services and authorized the Chairman to <br />execute same, as recommended in the memorandum of <br />December 21, 2005. <br /> <br />WORK ORDER #1 IS ON FILE <br />IN THE OFFICE OF THE CLERK TO THE BOARD <br /> <br />January 10, 2006 15 <br /> <br />