My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/9/1978
CBCC
>
Meetings
>
1970's
>
1978
>
10/9/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:08 AM
Creation date
6/11/2015 10:40:14 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
10/09/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�l <br />PRESENTED THEIR ORGANIZATIONAL CHART AND EXPLAINED THE VARIOUS DIS— <br />CIPLINES THAT WILL BE REQUIRED. HE POINTED OUT THAT SVERDRUP & PARCEL <br />HAS PERSONNEL IN VERO BEACH IN THE OFFICES OF BEINDORF & ASSOCIATES, <br />AND IF THEY SHOULD BE SELECTED TO DO THIS PROJECT, THEY WOULD EXPAND <br />THE STAFF IN THAT OFFICE. <br />MR. BALDWIN REVIEWED THEIR QUALIFICATIONS AND PRESENTED <br />PICTURES OF VARIOUS PROJECTS THEY HAVE WORKED ON, INCLUDING A PUBLIC <br />WORK CENTER FOR THE NAVY IN PENSACOLA AND A WINN DIXIE OFFICE COMPLEX <br />IN JACKSONVILLE. MR. BALDWIN NOTED THAT THEY HAVE DONE A LOT'OF RE— <br />MODELING WORK IN HOSPITALS AND KNOW WHAT OLD HOSPITALS ARE AND WHAT <br />TO EXPECT, MR. BALDWIN NOTED THAT HE WAS INVOLVED IN REDOING OF THE j <br />MIAMI BEACH POST OFFICE, AND THEY ALSO HAVE WORKED ON THE DADE COUNTY <br />SCHOOL SYSTEM. HE TEHN DISCUSSED HOW THEY'WOULD APPROACH — <br />R ACH THIS PROJECT <br />NOTING THAT THERE FIRST MUST BE A DETAILED STUDY OF WHAT IS THERE AND <br />WHAT CAN BE REUSED. HE SPOKE OF THE NEED FOR A NEW ROOF AND THE <br />NEED FOR IT TO BE TAKEN CARE OF EARLY IN THE PROJECT SO YOU DO NOT RUIN <br />WHAT YOU RENOVATE. HE STATED THAT THEY WOULD WORK WITH THE COUNTY <br />STAFF IN DETERMINING NEEDS. MR. BALDWIN ASSUMED THAT THE COUNTY IS NOT <br />TRYING TO BUILD A MONUMENTAL TYPE FACILITY, BUT A USEABLE STRUCTURE. <br />HE POINTED OUT THAT THE BUILDING WOULD HAVE TO BE BROUGHT UP TO CODE, <br />AND THERE ARE CODES NOW THAT WERE NOT IN EXISTENCE WHEN THE HOSPITAL <br />WAS BUILT. HE NOTED THAT WHEN YOU GET INTO MAKING A BUILDING FIT NEEDS <br />IT WAS NOT DESIGNED FOR, YOU MUST TEAR OUT, 'AND IN ORDER TO MAKE AIR <br />CONDITIONING AND ELECTRICAL SYSTEMS WORK TO FIT DIFFERENT NEEDS, YOU <br />PROBABLY WOULD HAVE TO DEMOLISH SHOME CORRIDOR CEILINGS. MR. BALDWIN <br />SPOKE OF GAINING OFFICE SPACE FROM MAKING USE OF CORRIDOR SPACE AND <br />DISCUSSED ELIMINATION OF THE LAUNDRY AND BOILERS. <br />MR. BEINDORF REVIEWED THE BACKGROUND OF THE COMPANY. HE <br />STATED THAT THEY HAVE THE DISCIPLINES TO COVER VERY WELL ANYTHING <br />CONNECTED WITH THE RENOVATION OF THE HOSPITAL. MR. BEINDORF STATED <br />o THAT HE AND TWO ARCHITECTS HAVE GONE THROUGH THE HOSPITAL, BUT HAVE NOT <br />DEVELOPED A PARTICULAR PLAN, THOUGH THEY HAVE THEIR OWN IDEAS. HE <br />NOTED, HOWEVER, THAT ALL THE DIFFERENT DEPARTMENTS THAT WILL BE MOVED <br />WILL HAVE THEIR OWN IDEAS, AND IT WILL REQUIRE A TEAM EFFORT TO ORGANIZE <br />7 <br />Boas 36 PAGE 46t') <br />OCT 9 1978 <br />
The URL can be used to link to this page
Your browser does not support the video tag.