Laserfiche WebLink
11.I.1. PUBLIC WORKS – COUNTY ROAD 512 PHASE V, I-95 TO <br />TH <br />WILLOW STREET (130 AVENUE) – MASTELLER, MOLER <br />& REED, INC. – DESIGN/TOPOGRAPHIC SURVEY – <br />CONTINUING PROFESSIONAL SURVEY SERVICES <br />CONTRACT 0390 – 2004-2005 WORK ORDER NO. 3 <br />(ENGINEERING) – IRC PROJECT NO. 0445 <br /> <br />MOTION WAS MADE by Vice Chairman Neuberger, <br />SECONDED by Commissioner Wheeler, to approve staff’s <br />recommendation. <br /> <br />Under discussion, Commissioner Davis wanted to see more aesthetically pleasing <br />roads. <br />Vice Chairman Neuberger pointed out the matter before them was just a survey of <br />the area, not the design. He agreed in concept and hoped the construction would flatten the curve. <br />Public Works Director Jim Davis confirmed that this item is for design survey only <br />rd <br />and does not include the design of CR-512. He noted that the 43 Avenue design had extensive <br />design and pointed out that portions of Indian River Boulevard have been landscaped. <br />Chairman Lowther agreed on the landscaping request. <br /> <br />The Chairman CALLED THE QUESTION and it carried <br />unanimously. (The Board unanimously approved the <br />proposed Work Order No. 3 \[Engineering\] with <br />Kimley-Horn & Associates, Inc., authorizing the above <br />project as outlined in the proposed scope of services, and <br />authorized the Chairman to execute the same for a lump <br />January 18, 2005 21 <br /> <br />