My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/1/1978
CBCC
>
Meetings
>
1970's
>
1978
>
11/1/1978
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:40:09 AM
Creation date
6/11/2015 10:44:34 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/01/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />6 <br />SVERDRUP & PARCEL AND ASSOCIATES, INC. <br />AND <br />BEINDORF AND ASSOCIATES, INC. <br />(A JOINT VENTURE) <br />October 31, 1978 <br />Project No. <br />Mr. Jack G. Jennings <br />Indian River County Administrator <br />County Courthouse, Room 115 <br />Vero Beach, Florida 32960 <br />Re: Waterline to Clemans <br />Elementary School <br />Dear Mr. Jennings: <br />. In a letter dated October 24, 1978, to Mr. William Wodtke, <br />Chairman, Board of County Commissioners, School Superintendent <br />William McClure asked if the County could provide water to the <br />Clemans Elementary School on 43rd Avenue. Indian River County <br />Utilities Director, George Morgan, and I investigated the feasi- <br />bility of providing a water line to the school and have <br />determined the following: <br />1) The proposed water line extension to serve the <br />school would connect to the 8" main at the <br />intersection of 40th Avenue and North Gifford - <br />Road. From there a 6" main would run 1200 feet <br />south along the east side of 43rd Avenue. At <br />the end of the 6" main, a fire hydrant would be <br />installed for fire protection and a 2�" line <br />would run east 280 feet to connect into the <br />school's existing 2Z' main near the well. <br />2) The total estimated cost for the School Board <br />would be $25,000; the cost to the County would <br />be approximately $4,700 for necessary items not <br />being part of that which the School Board should <br />pay.. <br />3) Time for' completion should be from 4 to 6 conse- <br />cutive weeks after the initial start of <br />construction. <br />REPLY TO: REPLY TO: <br />()o 3885 20TH STREET ( 1 2002 N.W. 13TH STREET <br />POST OFFICE BOX 849 SUITE 201 <br />VERO BEACH. FLORIDA 32960 GAINESVILLE, FLORIDA 32601 <br />9 <br />®� 1979 mix �18 Z <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.