Laserfiche WebLink
0 <br />ENGINEER .JAMES BEINDORF CAME BEFORE THE BOARD AND EXPLAINED <br />THAT HE BASICALLY WISHED TO DISCUSS THREE ITEMS: (1) THE PRELIMINARY <br />ENGINEERING AGREEMENT FOR THE SOUTH COUNTY WATER, (Z) TO REVIEW WHAT <br />THE CONSTRUCTION OF THE WATER SYSTEM HAS BEEN COSTING IN GIFFORD AND <br />PROJECT AHEAD WHAT WE CAN FORESEE WITH THE BIDS THAT WILL BE COMING IN <br />DECEMBER 6TH, AND (3) TO DISCUSS SOLVING THE SEWAGE TREATMENT SITUATION <br />IN GIFFORD. <br />HE PRESENTED THAT BOARD WITH A PROJECT COST STATUS REPORT FOR <br />PHASES I AND II OF THE GIFFORD WATER SYSTEM, NOTING THAT THE FIRST SHEET <br />IS A SUMMARY SHOWING WHAT WE HAVE SPENT SO FAR AND WHETHER'WE ARE AHEAD <br />OR BEHIND. HE POINTED OUT THAT WE HAVE NOT TAKEN BIDS FOR PHASE II AS <br />YET, AND ESTIMATED THAT WITH LIQUIDATED DAMAGES, WE ARE NOW AHEAD ABOUT <br />$131,000 AND, IN ADDITION, WE HAVE NOT TOUCHED THE CONTINGENCY FUNDS. <br />HE THEN REVIEWED THE REPORT, WHICH IS AS FOLLOWS: <br />NOV 15 1978 <br />40 <br />