Laserfiche WebLink
Ed <br />t <br />GENERAL. WATERWORKS • CENTRAL FLORIDA DISTRICT <br />161 WEST CANTON AVENUE • WINTER PARK, FLORIDA 32789 (305) 644.3964 <br />I <br />Mid -Florida Utilities, Inc. <br />Vero Beach, Florida <br />October 20, 1971 <br />Rathbun & Williams, Inc. Re: Water extension to serve: lots <br />Post Office Box 2712 1-12 Blk. 5, lots 1-24 Blk. 6, <br />Vero Beach, Florida 32960 and lots 14-19 Blk. 7, Glendale <br />Park Subdivision, resubdivided <br />Att: Mr. R. L. Rathbun, President to form 28 residential lots in <br />Indian River County, Florida. <br />Dear -Mr. Rathbun: <br />In accordance with your request that we extend our water mains within <br />tapping.. distanca of the above described property, we submit herewith <br />the cost figures for your review. <br />Total extension cost $.6,351.00 <br />Tapping fee ($65,00/connection as <br />required) $ <br />Total required amount $ 6.351.00 <br />Due to changing material and labor costs the foregoing should be considered <br />good for not more than 30 days. This cost anticipates that all water mains <br />and service lines will be installed prior to the bonding or'finish paving <br />work being done in any streets not presently paved; otherwise, all paving <br />costs will be for your account. As soon as you have deposited with us the <br />"Total required amount", we will install the extension as quickly as our <br />current job schedules and procurement of supplies permit. <br />We will gladly refund to you during the next 8 years only, an amount not <br />to -exceed $1,731.00 uti.ch amount represents the "Total extension cost" less <br />28 connection charges of $1.65.00, depending entirely on the Suture additional. <br />number of metered domestic services for completed buildings occupied by <br />owners or tenants and connected on that part of the extension now paid for <br />by you. Such refund mill be on the basis of: <br />(1) A flat refund of 3 times the first yearts. gross water revenue <br />from each future additional metered service, or, ( ) <br />(2) A flat refund of $100.00 per future additional metered <br />service (�) <br />(Please indicate choice of refund) <br />A MEMBER OF THE INTERNATIONAL UTILITIES GROUP <br />�r <br />f <br />1 <br />a <br />